Revision history of "Use of renewable energy sources through the installation of photovoltaic panels and heat pumps by Zakład Usług Drzewnych Bogdan Lisiewski" (Q131725)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:1004:10, 11 October 2024DG Regio talk contribs 92,316 bytes +5 Changed label, description and/or aliases in pt
  • curprev 04:1004:10, 11 October 2024DG Regio talk contribs 92,311 bytes +19 Set a claim value: summary (P836): O investimento abrangido por este projeto consiste na aquisição e montagem de uma central fotovoltaica com uma capacidade de 39,6 kW e na aquisição e montagem de uma bomba de calor com uma capacidade de aquecimento de 17,2 kW (potência elétrica de 3,49 kW) no edifício em ul. Industrial 7 em Piecky nas parcelas n.os 88/5, 88/7 e 88/9. O projeto enquadra-se no tipo de projeto mencionado no SzOOP RPO WiM 2014-2020 para a ação 4.1 — instalações que util...

20 March 2024

15 January 2024

14 June 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:2020:20, 2 March 2023DG Regio talk contribs 88,757 bytes −356 Changed label, description and/or aliases in da, it, sk, es, et, de, cs, sv, lt, ga, bg, fi, lv, ro, nl, pt, hr, el, fr, sl, hu, mt, and other parts

25 October 2022

21 October 2022

27 July 2022

  • curprev 17:3717:37, 27 July 2022DG Regio talk contribs 87,440 bytes +56,630 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:2619:26, 2 December 2021DG Regio talk contribs 18,469 bytes +3,105 Created claim: summary (P836): L’investissement couvert par ce projet consiste en l’achat et l’installation d’une centrale photovoltaïque de 39,6 kW et l’achat et l’installation d’une pompe à chaleur d’une puissance calorifique de 17,2 kW (3,49 kW) dans un bâtiment à ul. Industriel 7 à Piecky sur les parcelles 88/5, 88/7 et 88/9. Le projet s’inscrit dans le type de projet indiqué dans le SzOOP ROP WiM 2014-2020 pour la mesure 4.1 — installations utilisant l’énergie solaire et...
  • curprev 19:2619:26, 2 December 2021DG Regio talk contribs 15,364 bytes +229 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 15:5815:58, 21 October 2020DG Regio talk contribs 15,574 bytes +199 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5815:58, 21 October 2020DG Regio talk contribs 15,375 bytes −192 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5815:58, 21 October 2020DG Regio talk contribs 15,567 bytes +2,773 Created claim: summary (P836): The investment covered by this project consists of the purchase and assembly of a photovoltaic power plant with a capacity of 39.6 kW and the purchase and assembly of a heat pump with a heating capacity of 17,2 kW (electric power 3.49 kW) in the building at ul. Industrial 7 in Piecky on plots No. 88/5, 88/7 and 88/9. The project fits into the type of project mentioned in the SzOOP RPO WiM 2014-2020 for action 4.1 – installations using solar and...
  • curprev 15:5815:58, 21 October 2020DG Regio talk contribs 12,794 bytes −2,244 Removed claim: summary (P836): The investment covered by this project consists of the purchase and installation of a photovoltaic power plant of 39.6 kW and the purchase and assembly of a heat pump with a heating output of 17.2 kW (electric power of 3.49 kW) in the building at ul. Industrial 7 in Piecki, on plots Nos 88/5, 88/7 and 88/9. The project is part of the project type referred to in SzOOP ROP WM 2014-2020 for measure 4.1 — solar and earth installations (e.g. solar...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:3320:33, 10 March 2020DG Regio talk contribs 13,319 bytes +2,244 Created claim: summary (P836): The investment covered by this project consists of the purchase and installation of a photovoltaic power plant of 39.6 kW and the purchase and assembly of a heat pump with a heating output of 17.2 kW (electric power of 3.49 kW) in the building at ul. Industrial 7 in Piecki, on plots Nos 88/5, 88/7 and 88/9. The project is part of the project type referred to in SzOOP ROP WM 2014-2020 for measure 4.1 — solar and earth installations (e.g. solar co...

25 February 2020

18 February 2020

31 January 2020

14 January 2020