Revision history of "“The use of renewable energy sources in a comprehensive modernisation of the heating system for the buildings of the Municipal Cultural Centre and Fire Service in Bishops”" (Q131719)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:1004:10, 11 October 2024DG Regio talk contribs 94,343 bytes +14 Changed label, description and/or aliases in pt
  • curprev 04:1004:10, 11 October 2024DG Regio talk contribs 94,329 bytes +24 Set a claim value: summary (P836): O objeto do investimento é a reconstrução do sistema de aquecimento no edifício GOK e OSP em Biskupec, no terreno n.o 621/2 do edifício, com base numa bomba de calor do tipo água salgada, que extrai calor do solo através de um permutador de calor vertical. Instalação interna do sistema nas rotas actuais. Foi concebido um sistema de aquecimento: um sistema de água de dois tubos fechado. Método de aquecimento ambiente através de radiadores de chapa de...

22 March 2024

15 January 2024

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:2020:20, 2 March 2023DG Regio talk contribs 91,547 bytes −570 Changed label, description and/or aliases in lv, da, sk, it, cs, el, hu, fr, ga, fi, et, bg, ro, lt, nl, hr, sv, pt, mt, sl, de, es, and other parts

25 October 2022

21 October 2022

2 July 2022

  • curprev 22:4422:44, 2 July 2022DG Regio talk contribs 90,442 bytes +58,755 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:2519:25, 2 December 2021DG Regio talk contribs 18,682 bytes +3,182 Created claim: summary (P836): L’objectif de l’investissement est la reconstruction du système de chauffage dans le bâtiment GOK et le GRT à Biskupiec sur le terrain no 621/2 dans le bâtiment, à partir d’une pompe à chaleur saumâtre-eau, qui puise la chaleur du sol par un échangeur de chaleur vertical. Installation du système interne sur les itinéraires actuels. Un système de chauffage a été conçu: un système de fermeture à deux tuyaux à base d’eau. Méthode de chauffage à l’a...
  • curprev 19:2519:25, 2 December 2021DG Regio talk contribs 15,500 bytes +246 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 15:5715:57, 21 October 2020DG Regio talk contribs 15,693 bytes +235 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5715:57, 21 October 2020DG Regio talk contribs 15,458 bytes −232 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5715:57, 21 October 2020DG Regio talk contribs 15,690 bytes +2,795 Created claim: summary (P836): The subject of the investment is the reconstruction of the heating system in the GOK and OSP building in Biskupec on plot no.621/2 in the building, based on a heat pump of the brine-water type, which draws heat from the ground through a vertical heat exchanger. Internal installation of the system on current routes. A heating system has been designed: a water two-tube system closed. Method of space heating through steel plate radiators: — heating...
  • curprev 15:5715:57, 21 October 2020DG Regio talk contribs 12,895 bytes −2,530 Removed claim: summary (P836): The subject of the investment is the renovation of the heating installation in the building of the GOK and the TSOs in Bikupac on plot No 621/2 in the building, based on the brine pump of the brine water type and collecting heat from the ground by a vertical heat exchanger. The internal installation of the system on the current routes. A heating installation has been designed: a double-tubular closed system. Form of space heating through steel...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:3320:33, 10 March 2020DG Regio talk contribs 13,710 bytes +2,530 Created claim: summary (P836): The subject of the investment is the renovation of the heating installation in the building of the GOK and the TSOs in Bikupac on plot No 621/2 in the building, based on the brine pump of the brine water type and collecting heat from the ground by a vertical heat exchanger. The internal installation of the system on the current routes. A heating installation has been designed: a double-tubular closed system. Form of space heating through steel p...

25 February 2020

18 February 2020

31 January 2020

14 January 2020