Revision history of "Construction of photovoltaic micro-installation and installation of 2 heat pumps by Janina Karasek- Tagomago LIFE." (Q131716)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:3116:31, 10 October 2024DG Regio talk contribs 94,174 bytes +23 Set a claim value: summary (P836): O investimento abrangido por este projeto consiste na aquisição e montagem de centrais fotovoltaicas com uma capacidade de 39,76 kW e na aquisição e montagem de duas bombas de calor com uma potência de aquecimento de 7,7 kW e 37,2 kW (potência elétrica de 1,57 kW e 7,64 kW) no edifício Nawiady 63 em Piecky, no terreno n.o 362. O projeto enquadra-se no tipo de projeto mencionado no SzOOP RPO WiM 2014-2020 para a ação 4.1 — instalações que utilizam en...

20 March 2024

15 January 2024

14 June 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:2020:20, 2 March 2023DG Regio talk contribs 90,616 bytes −111 Changed label, description and/or aliases in da, it, et, sk, fi, hr, lt, es, fr, hu, ro, lv, sv, bg, nl, de, el, sl, cs, mt, and other parts

25 October 2022

21 October 2022

2 July 2022

  • curprev 22:4422:44, 2 July 2022DG Regio talk contribs 89,054 bytes +57,701 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:2519:25, 2 December 2021DG Regio talk contribs 18,647 bytes +3,233 Created claim: summary (P836): L’investissement couvert par ce projet consiste en l’achat et l’installation d’une centrale photovoltaïque de 39,76 kW et l’achat et l’installation de 2 pompes à chaleur d’une capacité de chauffage de 7,7 kW et 37,2 kW (électricité 1,57 kW et 7,64 kW) dans le bâtiment de Nawiady 63 à Piecky sur le terrain no 362. Le projet s’inscrit dans le type de projet indiqué dans le SzOOP ROP WiM 2014-2020 pour la mesure 4.1 — installations utilisant l’éner...
  • curprev 19:2519:25, 2 December 2021DG Regio talk contribs 15,414 bytes +186 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 15:5715:57, 21 October 2020DG Regio talk contribs 15,667 bytes +174 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5715:57, 21 October 2020DG Regio talk contribs 15,493 bytes −176 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5715:57, 21 October 2020DG Regio talk contribs 15,669 bytes +2,896 Created claim: summary (P836): The investment covered by this project consists of the purchase and assembly of photovoltaic power plants with a capacity of 39.76 kW and the purchase and assembly of 2 heat pumps with heating power of 7.7 kW and 37.2 kW (electric power 1.57 kW and 7.64 kW) in the building in Nawiady 63 in Piecky on plot No 362. The project fits into the type of project mentioned in the SzOOP RPO WiM 2014-2020 for action 4.1 – installations using solar and earth...
  • curprev 15:5715:57, 21 October 2020DG Regio talk contribs 12,773 bytes −2,353 Removed claim: summary (P836): The investment covered by this project consists of the purchase and installation of a photovoltaic power plant of 39.76 kW and the purchase and assembly of 2 heat pumps with a heating output of 7.7 kW and 37.2 kW (electric power of 1.57 kW and 7.64 kW) in the building in Naviadach 63 in Picki, plot No. 362. The project is part of the project type referred to in SzOOP ROP WM 2014-2020 for measure 4.1 — solar and earth installations (e.g. solar...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:3220:32, 10 March 2020DG Regio talk contribs 13,411 bytes +2,353 Created claim: summary (P836): The investment covered by this project consists of the purchase and installation of a photovoltaic power plant of 39.76 kW and the purchase and assembly of 2 heat pumps with a heating output of 7.7 kW and 37.2 kW (electric power of 1.57 kW and 7.64 kW) in the building in Naviadach 63 in Picki, plot No. 362. The project is part of the project type referred to in SzOOP ROP WM 2014-2020 for measure 4.1 — solar and earth installations (e.g. solar co...

25 February 2020

18 February 2020

31 January 2020

14 January 2020