Revision history of "Use of telemetry and implementation of e-services in water management. — kan. The Municipal Economy Plant in Barciany Sp. z o.o." (Q131561)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2306:23, 9 October 2024DG Regio talk contribs 98,563 bytes −20 Changed label, description and/or aliases in pt
  • curprev 06:2306:23, 9 October 2024DG Regio talk contribs 98,583 bytes −64 Set a claim value: summary (P836): As partes interessadas do projeto. Serão disponibilizados 2 serviços eletrónicos relacionados com o tratamento e a liquidação do abastecimento de água e da descarga de águas residuais pela ZGK em Barciany aos residentes do município e aos contratantes, incluindo: 1. Serviço de acesso a faturas eletrónicas com possibilidade de pagamento em linha e de indicação do contador a partir da última leitura e dos estados históricos de faturação (nível de matu...

23 March 2024

15 January 2024

14 June 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 18:5218:52, 2 March 2023DG Regio talk contribs 95,112 bytes +2,104 Changed label, description and/or aliases in da, it, sk, lv, fi, es, hr, ro, sl, cs, sv, el, de, et, fr, lt, mt, bg, hu, pt, nl, ga, and other parts

25 October 2022

21 October 2022

2 July 2022

  • curprev 22:4022:40, 2 July 2022DG Regio talk contribs 91,333 bytes +59,193 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 19:4419:44, 2 December 2021DG Regio talk contribs 18,854 bytes +3,284 Created claim: summary (P836): Aux parties prenantes Proj. 2 services électroniques liés à la manutention et à la comptabilisation de l’approvisionnement en eau et des rejets d’eaux usées par ZGK à Barciany seront mis à disposition, notamment: 1. Notification de l’accès aux factures électroniques avec possibilité de paiement en ligne et d’indiquer le compteur de la dernière lecture et les états historiques de règlement (degré de maturité 4). 2. Service de réservation du calen...
  • curprev 19:4419:44, 2 December 2021DG Regio talk contribs 15,570 bytes +242 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 17:3217:32, 21 October 2020DG Regio talk contribs 15,767 bytes +190 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:3217:32, 21 October 2020DG Regio talk contribs 15,577 bytes −182 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:3217:32, 21 October 2020DG Regio talk contribs 15,759 bytes +2,856 Created claim: summary (P836): The project’s stakeholders. 2 e-services related to the handling and settlement of water supply and waste water discharge by ZGK in Barciany will be made available to residents of the municipality and contractors, including: 1. Service of access to electronic invoices with the possibility of online payment and to indicate the counter from the last reading and historical billing states.(Maturity level 4). 2. Booking calendar service. The E-servic...
  • curprev 17:3217:32, 21 October 2020DG Regio talk contribs 12,903 bytes −2,393 Removed claim: summary (P836): Stakeholders proj. (municipalities and counterparties) will be provided with 2 e-services related to the handling and discharge of water supply and discharge by ZAK in Barcians, including: 1. A service to access electronic invoices with the possibility of online payment and to identify the last reading meter and the historical accounting positions (maturity 4). 2. Booking schedule service. The e-service system will be located on the server of...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:2820:28, 10 March 2020DG Regio talk contribs 13,581 bytes +2,393 Created claim: summary (P836): Stakeholders proj. (municipalities and counterparties) will be provided with 2 e-services related to the handling and discharge of water supply and discharge by ZAK in Barcians, including: 1. A service to access electronic invoices with the possibility of online payment and to identify the last reading meter and the historical accounting positions (maturity 4). 2. Booking schedule service. The e-service system will be located on the server of th...

25 February 2020

18 February 2020

31 January 2020

14 January 2020