Revision history of "Preparation of the site for future investments through hardening of the terrain, construction of external rainwater drainage installations" (Q130225)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:4415:44, 7 October 2024DG Regio talk contribs 92,854 bytes +19 Changed label, description and/or aliases in pt
  • curprev 15:4415:44, 7 October 2024DG Regio talk contribs 92,835 bytes +99 Set a claim value: summary (P836): O projeto «Preparar o local para futuros investimentos através da cura do terreno, a construção de uma instalação externa de esgotos de águas pluviais» tem por objeto a preparação dos locais detidos pela Ajram Sp.z o.o., a fim de desenvolver o seu potencial de produção e, por conseguinte, o desenvolvimento de toda a empresa. A intervenção resultará num aumento do investimento privado, para além do apoio público. Tal é coerente com as disposições do...

23 March 2024

15 January 2024

13 December 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:1620:16, 2 March 2023DG Regio talk contribs 89,562 bytes −1,282 Changed label, description and/or aliases in lv, it, da, sk, lt, ro, sl, pt, fi, sv, de, et, hr, fr, hu, bg, el, mt, nl, cs, es, ga, and other parts

3 December 2022

3 November 2022

25 October 2022

20 October 2022

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 11:3811:38, 2 December 2021DG Regio talk contribs 18,276 bytes +3,213 Created claim: summary (P836): Le projet «Préparer le site pour les investissements futurs par le durcissement des terres, l’installation d’eau de pluie externe» est de préparer le terrain appartenant à Ajram Sp.z o.o. afin de développer son potentiel de production et ainsi développer l’ensemble de l’entreprise. L’intervention se traduira par une augmentation des investissements privés complétant le soutien public. Ceci est conforme aux dispositions du SzOOP ROP WiM pour l’ax...
  • curprev 11:3811:38, 2 December 2021DG Regio talk contribs 15,063 bytes +197 Changed label, description and/or aliases in fr: translated_label

25 July 2021

29 October 2020

21 October 2020

  • curprev 12:5012:50, 21 October 2020DG Regio talk contribs 14,891 bytes +198 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:5012:50, 21 October 2020DG Regio talk contribs 14,693 bytes −177 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:5012:50, 21 October 2020DG Regio talk contribs 14,870 bytes +2,951 Created claim: summary (P836): The subject of the project “Preparing the site for future investments by curing the land, the construction of an external rainwater sewer installation” is the preparation of the sites owned by Ajram Sp.z o.o. in order to develop its production potential and thus the development of the whole company. The intervention will result in increased private investment in addition to public support. This is consistent with the provisions of the SzOOP RPO...
  • curprev 12:5012:50, 21 October 2020DG Regio talk contribs 11,919 bytes −2,517 Removed claim: summary (P836): The project ‘Preparing the ground for future investments by means of paving the way for a site, the installation of an external storm-water system’ is to prepare the land owned by AHARAM Sp.z o.o. for the purpose of its production potential and thus the development of the company as a whole. The intervention will result in an increase in private investment in support of public support. This is in line with the management of the ROP WiM for Osi...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 12:5612:56, 10 March 2020DG Regio talk contribs 13,165 bytes +2,517 Created claim: summary (P836): The project ‘Preparing the ground for future investments by means of paving the way for a site, the installation of an external storm-water system’ is to prepare the land owned by AHARAM Sp.z o.o. for the purpose of its production potential and thus the development of the company as a whole. The intervention will result in an increase in private investment in support of public support. This is in line with the management of the ROP WiM for Osi I...

25 February 2020

18 February 2020

31 January 2020

14 January 2020