Revision history of "Establishment of a research department at Oristo" (Q130102)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:2916:29, 10 October 2024DG Regio talk contribs 77,316 bytes −76 Set a claim value: summary (P836): O projecto consistirá na criação de um departamento de investigação através da aquisição das infra-estruturas necessárias. O âmbito material do projeto inclui a aquisição de equipamento para criar as condições adequadas para a investigação sobre o desenvolvimento de novos produtos. O projeto será realizado numa única fase, abrangendo todas as aquisições no âmbito do projeto. Esta fase decorrerá entre outubro de 2018 e dezembro de 2019. O projeto pre...

20 March 2024

15 January 2024

13 December 2023

14 June 2023

9 June 2023

24 May 2023

2 March 2023

3 December 2022

26 October 2022

20 October 2022

27 July 2022

  • curprev 17:1517:15, 27 July 2022DG Regio talk contribs 70,621 bytes +44,521 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 09:1909:19, 2 December 2021DG Regio talk contribs 16,058 bytes +2,422 Created claim: summary (P836): Le projet consistera à mettre en place un département de recherche en achetant les infrastructures nécessaires. Le champ d’application matériel du projet comprend l’achat d’équipements pour créer les conditions propices à la recherche sur le développement de nouveaux produits. Le projet sera réalisé en une seule phase, couvrant tous les achats effectués dans le cadre du projet. Cette phase se déroulera entre octobre 2018 et décembre 2019. Le pro...
  • curprev 09:1909:19, 2 December 2021DG Regio talk contribs 13,636 bytes +111 Changed label, description and/or aliases in fr: translated_label

25 July 2021

29 October 2020

21 October 2020

  • curprev 15:4915:49, 21 October 2020DG Regio talk contribs 13,550 bytes +107 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:4915:49, 21 October 2020DG Regio talk contribs 13,443 bytes −100 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:4915:49, 21 October 2020DG Regio talk contribs 13,543 bytes +2,310 Created claim: summary (P836): The project will consist of the creation of a research department by purchasing the necessary infrastructure. The project’s material scope includes the purchase of equipment to create the right conditions for research into the development of new products. The project will be carried out within a single phase, covering all purchases within the project. This phase will range from October 2018 to December 2019. The project foresees the incurrence o...
  • curprev 15:4915:49, 21 October 2020DG Regio talk contribs 11,233 bytes −1,750 Removed claim: summary (P836): The project will consist of the creation of a research unit through the purchase of the necessary infrastructure. The material scope of the project includes the purchase of equipment to create the right conditions for research into the development of new products. The project will be carried out in one phase covering all the purchases within the project. This phase will be in the range from October 2018 to December 2019. The project provides f...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 20:0620:06, 10 March 2020DG Regio talk contribs 11,700 bytes +1,750 Created claim: summary (P836): The project will consist of the creation of a research unit through the purchase of the necessary infrastructure. The material scope of the project includes the purchase of equipment to create the right conditions for research into the development of new products. The project will be carried out in one phase covering all the purchases within the project. This phase will be in the range from October 2018 to December 2019. The project provides for...

25 February 2020

18 February 2020

31 January 2020

14 January 2020