Revision history of "Who’s in the way, this job!" (Q129143)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

26 October 2022

20 October 2022

27 July 2022

  • curprev 17:1017:10, 27 July 2022DG Regio talk contribs 49,472 bytes +29,953 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 09:0209:02, 2 December 2021DG Regio talk contribs 12,982 bytes +1,537 Created claim: summary (P836): Objectif du projet: amélioration de la situation professionnelle et sociale 52 Onks (36K+ 16M dont 3 ON=2K+ 1M) émeutes. PO29 qui sont OB (18K+ 12M avec profil d’aide I et II), y compris DB(4K+ 2M) ou BZ (17K+ 5M), grâce à la participation au programme d’activation complet. Les indicateurs comprennent: —L. travaillant après le programme: 20 -L.os qui ont obtenu des qualificatifs.Suivant le programme: 52 Wsk. produit, entre autres, le nombre de:...
  • curprev 09:0209:02, 2 December 2021DG Regio talk contribs 11,445 bytes +99 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 15:4415:44, 21 October 2020DG Regio talk contribs 11,785 bytes +88 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:4415:44, 21 October 2020DG Regio talk contribs 11,697 bytes −77 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:4415:44, 21 October 2020DG Regio talk contribs 11,774 bytes +1,497 Created claim: summary (P836): Objective of the project: improvement of occupational and social situation 52 ONK (36K+ 16M of which 3 ON=2K+ 1M) riot. WW, after 29 years, which are OB (18K+ 12M with I and II aid profiles) including DB(4K+ 2M) or BZ (17K+ 5M), through participation in the abovementioned programme, incl. Indicators include: —L. those working after the program has left:20 -L.os who have been qualified.after the program:52 In the product, among others, the number...
  • curprev 15:4415:44, 21 October 2020DG Regio talk contribs 10,277 bytes −932 Removed claim: summary (P836): Objective: improving the professional and social situation of 52onk (36K + 16M including 3 ON = 2K + 1M) WŚ, post 29, which are OB (18K + 12M, I and II) including DB (4K + 2M) or BZ (17K + 5M), through participation in a comprehensive activation scheme. Indicators such as: Following the exit of the programme: 20 -L.os, who were eligible for the programme at the end of the programme: 52. — OB (including the Upload.) supported by PROGR: 30-db jh...

25 September 2020

24 September 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 19:5219:52, 10 March 2020DG Regio talk contribs 9,919 bytes +932 Created claim: summary (P836): Objective: improving the professional and social situation of 52onk (36K + 16M including 3 ON = 2K + 1M) WŚ, post 29, which are OB (18K + 12M, I and II) including DB (4K + 2M) or BZ (17K + 5M), through participation in a comprehensive activation scheme. Indicators such as: Following the exit of the programme: 20 -L.os, who were eligible for the programme at the end of the programme: 52. — OB (including the Upload.) supported by PROGR: 30-db jh:...

25 February 2020

18 February 2020

31 January 2020

14 January 2020