Revision history of "Comprehensive modernisation and retrofitting of educational establishments in the municipality of Skalbmierz" (Q128110)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:4415:44, 7 October 2024DG Regio talk contribs 93,823 bytes +2 Changed label, description and/or aliases in pt
  • curprev 15:4415:44, 7 October 2024DG Regio talk contribs 93,821 bytes +186 Set a claim value: summary (P836): Há duas escolas em Gm. Skalb: Centro educativo da escola em Skalbm e complexo escolar em Topoli. Eles estão num mau estado de tecnologia. Realiz.proj. inclui moderno. e retrofit. São duas escolas. Um ginasta moderno está previsto no ZPO. (cyclin. e paint. parquet, paredes de pintura, sala de varanda-vista, moderno. vestiário e sanitário, chuveiros e magaz. para equipamento desportivo, espaço de sala. com a finalidade de biblioteca e reparação de esc...

22 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

3 November 2022

27 October 2022

26 October 2022

19 October 2022

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 09:0309:03, 2 December 2021DG Regio talk contribs 17,709 bytes +3,272 Created claim: summary (P836): Il y a 2 écoles à Skalb.: Une équipe d’établissements d’enseignement à Skalbm. et le complexe scolaire de Topoli. La tête de Probl est leur mauvais état technique. Le projet comprend moderne. et mise à niveau. 2 écoles. Une salle de sport moderne est prévue à ZPO. (cyclone et mal. parquet, murs mal, rem. écran de balcon, moderne. vestiaires et sanitaires, douches et magazines. sur l’équipement sportif, chambres rem. avec réservés. pour la biblio...
  • curprev 09:0309:03, 2 December 2021DG Regio talk contribs 14,437 bytes +171 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 12:0912:09, 21 October 2020DG Regio talk contribs 14,705 bytes +168 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:0912:09, 21 October 2020DG Regio talk contribs 14,537 bytes −168 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:0912:09, 21 October 2020DG Regio talk contribs 14,705 bytes +2,883 Created claim: summary (P836): There are 2 schools in Gm. Skalb: The school’s educational center in Skalbm. and the School Complex in Topoli. They're in a bad state of tech. Realiz.proj. includes modern. and retrofit. It’s 2 schools. A modern gymnast is planned in the ZPO. (cyclin. and paint. parquet, painting walls, balcony-view room, modern. locker room and sanitary, showers and magaz. for sports equipment, room space. with the purpose for library and repair of staircase, e...
  • curprev 12:0912:09, 21 October 2020DG Regio talk contribs 11,822 bytes −2,003 Removed claim: summary (P836): In the Gm, there are 2 sub-schools: The Skalbm. assembly and the Topoli School Complex. The head of the tube is their poor state of tech. In order to modernise and retrofit. 2 schools. The ZPO is designed to be moderated. Wooden parks, walls, walls, greens and site., showers and mountings for sports equipment, including furniture, for the library and renovation of the cage, including frames for doors, with a disability; REM. 4 works. (mats, 2,...

25 September 2020

24 September 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 12:5312:53, 10 March 2020DG Regio talk contribs 12,533 bytes +2,003 Created claim: summary (P836): In the Gm, there are 2 sub-schools: The Skalbm. assembly and the Topoli School Complex. The head of the tube is their poor state of tech. In order to modernise and retrofit. 2 schools. The ZPO is designed to be moderated. Wooden parks, walls, walls, greens and site., showers and mountings for sports equipment, including furniture, for the library and renovation of the cage, including frames for doors, with a disability; REM. 4 works. (mats, 2,)...

25 February 2020

18 February 2020

31 January 2020

14 January 2020