Revision history of "Development of educational infrastructure in the municipality of Mirzec" (Q128049)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:1504:15, 11 October 2024DG Regio talk contribs 78,873 bytes −3 Set a claim value: summary (P836): O principal objetivo do projeto é aumentar a acessibilidade a infraestruturas desportivas modernas e bem equipadas e aumentar a utilização de métodos de aprendizagem modernos. As escolas abrangidas pelo projeto são as seguintes: Escola primária em Trębowiec, SP em conversa, SP em Tychy Stary, SP em Małyszyn, SP em Jagodny, SP em Osiny, SP em Tychy Nowy, SP em Mircu. O projeto consiste em: 1. modernização do campo de Jagodne SP, 2. modernização do ca...

7 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

19 October 2022

2 July 2022

  • curprev 21:4221:42, 2 July 2022DG Regio talk contribs 72,777 bytes +46,538 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 09:0009:00, 2 December 2021DG Regio talk contribs 15,885 bytes +2,519 Created claim: summary (P836): L’objectif principal du projet est d’accroître la disponibilité d’infrastructures sportives modernes et bien équipées et d’accroître l’utilisation de méthodes d’enseignement modernes. Les écoles couvertes par le projet sont les suivantes: École primaire à Trębowiec, SP à Gadka, SP à Tychy Stary, SP à Małyszyn, SP à Jagodny, SP à Osina, SP à Tychy Nowy, SP à Mirc. Le projet consiste en: 1. modernisation du terrain à SP Jagodne, 2. modernisation d...
  • curprev 09:0009:00, 2 December 2021DG Regio talk contribs 13,366 bytes +137 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 11:5211:52, 21 October 2020DG Regio talk contribs 13,668 bytes +130 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:5211:52, 21 October 2020DG Regio talk contribs 13,538 bytes −130 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:5211:52, 21 October 2020DG Regio talk contribs 13,668 bytes +2,403 Created claim: summary (P836): The main objective of the project is to increase accessibility to modern well-equipped sports infrastructure and to increase the use of modern learning methods. The schools covered by the project are: Primary school in Trębowiec, SP in talk, SP in Tychy Stary, SP in Małyszyn, SP in Jagodny, SP in Osiny, SP in Tychy Nowy, SP in Mircu. The project consists of: 1. modernisation of the pitch at the Jagodne SP, 2. modernisation of the pitch at SP Trę...
  • curprev 11:5211:52, 21 October 2020DG Regio talk contribs 11,265 bytes −1,955 Removed claim: summary (P836): The main objective of the project is to increase the availability to a modern, equipped sport infrastructure and to increase the use of modern teaching methods. The schools covered by the project are: The Primary School, Twórze School, SP in Gadce, SP in Tyów Story, SP in Malyzynie, SP in Jasdignified, SP in Oscars, SP at Tytownalia Nowy, SP in Mircu. The project consists of: 1. modernisation of the pitches at SP Jasz., 2. modernisation of the...

25 September 2020

24 September 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 12:5312:53, 10 March 2020DG Regio talk contribs 11,936 bytes +1,955 Created claim: summary (P836): The main objective of the project is to increase the availability to a modern, equipped sport infrastructure and to increase the use of modern teaching methods. The schools covered by the project are: The Primary School, Twórze School, SP in Gadce, SP in Tyów Story, SP in Malyzynie, SP in Jasdignified, SP in Oscars, SP at Tytownalia Nowy, SP in Mircu. The project consists of: 1. modernisation of the pitches at SP Jasz., 2. modernisation of the f...

25 February 2020

18 February 2020

31 January 2020

14 January 2020