Revision history of "Development of educational infrastructure through modernisation and retrofitting of the building of the Primary School in Tarłów" (Q128032)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:4415:44, 7 October 2024DG Regio talk contribs 83,161 bytes 0 Changed label, description and/or aliases in pt
  • curprev 15:4415:44, 7 October 2024DG Regio talk contribs 83,161 bytes +35 Set a claim value: summary (P836): No âmbito do projeto, a modernização do edifício da Escola Primária de Tarłów será realizada com material didático moderno. Serão realizadas tarefas de investimento relacionadas com a modernização do edifício escolar e tarefas relacionadas com a adaptação das instalações de ensino – matemática, ciências naturais, informática e sala comum, o que aumentará a qualidade do ensino e melhorará a competência dos alunos. O projeto está em conformidade com o...

22 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 16:3216:32, 2 March 2023DG Regio talk contribs 79,952 bytes −440 Changed label, description and/or aliases in it, ro, lv, fr, da, el, fi, sk, es, et, cs, ga, pt, lt, hu, sv, hr, sl, de, bg, nl, mt, and other parts

27 October 2022

26 October 2022

19 October 2022

2 July 2022

  • curprev 21:4221:42, 2 July 2022DG Regio talk contribs 78,273 bytes +50,860 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 08:5908:59, 2 December 2021DG Regio talk contribs 16,413 bytes +2,664 Created claim: summary (P836): Dans le cadre du projet, la construction de l’école primaire de Tarłów sera modernisée avec des supports pédagogiques modernes. Des tâches d’investissement liées à la modernisation du bâtiment scolaire et des tâches liées à la modernisation des installations d’enseignement — mathématiques, nature, informatique et garderie seront réalisées, ce qui améliorera la qualité de l’enseignement et améliorera les compétences des élèves. Le projet est conf...
  • curprev 08:5908:59, 2 December 2021DG Regio talk contribs 13,749 bytes +201 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 11:5211:52, 21 October 2020DG Regio talk contribs 13,987 bytes +190 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:5211:52, 21 October 2020DG Regio talk contribs 13,797 bytes −201 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:5211:52, 21 October 2020DG Regio talk contribs 13,998 bytes +2,435 Created claim: summary (P836): As part of the project, modernisation of the building of the Primary School in Tarłów will be carried out with modern teaching aids. Investment tasks, related to modernisation of the school building and tasks related to retrofitting the teaching facilities – mathematics, natural science, IT and common room, will be carried out, which will increase the quality of teaching and improve the competence of pupils. The project is in line with priority...
  • curprev 11:5211:52, 21 October 2020DG Regio talk contribs 11,563 bytes −1,984 Removed claim: summary (P836): The project will modernise the core of the Primary School in Tarłowo, with the equipment of the establishment in modern teaching aids. The investment tasks will be carried out, linked to the modernisation of the school building and the tasks associated with the retrofitting of educational facilities — mathematics, science, IT and after-school centres, which will improve the quality of teaching and students’ competences. The project is in line...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 12:5312:53, 10 March 2020DG Regio talk contribs 12,262 bytes +1,984 Created claim: summary (P836): The project will modernise the core of the Primary School in Tarłowo, with the equipment of the establishment in modern teaching aids. The investment tasks will be carried out, linked to the modernisation of the school building and the tasks associated with the retrofitting of educational facilities — mathematics, science, IT and after-school centres, which will improve the quality of teaching and students’ competences. The project is in line wi...

25 February 2020

18 February 2020

31 January 2020

14 January 2020