Revision history of "Modernisation of sewage treatment plants in the city. ♪ You're dreaming ♪" (Q127788)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:4318:43, 8 October 2024DG Regio talk contribs 78,942 bytes +7 Changed label, description and/or aliases in pt
  • curprev 18:4318:43, 8 October 2024DG Regio talk contribs 78,935 bytes +15 Set a claim value: summary (P836): O objectivo do projecto é organizar a gestão da água e das águas residuais no distrito de Daleszyce através da modernização da estação de tratamento de águas residuais na aldeia de Marzysz, ligada à reconstrução do sistema ACP iA, juntamente com a substituição do equipamento tecnológico na estação de tratamento de águas residuais. O objetivo do projeto está em consonância com o objetivo específico da ação 4.3 Gestão da água no âmbito do RPOWŚ 2014-2...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

3 March 2023

  • curprev 00:4400:44, 3 March 2023DG Regio talk contribs 75,746 bytes +299 Changed label, description and/or aliases in it, da, sk, hr, et, ga, pt, lt, sv, de, lv, fi, es, fr, hu, el, cs, nl, sl, bg, mt, ro, and other parts

27 October 2022

26 October 2022

19 October 2022

27 July 2022

  • curprev 16:5316:53, 27 July 2022DG Regio talk contribs 73,325 bytes +46,820 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 11:1411:14, 2 December 2021DG Regio talk contribs 15,901 bytes +2,585 Created claim: summary (P836): L’objectif du projet est d’organiser la gestion de l’eau et des eaux usées dans la commune de Daleszyce en modernisant la station d’épuration des eaux usées de Marzysz associée à la reconstruction du système ACPiA ainsi qu’au remplacement des équipements technologiques de la station d’épuration des eaux usées. L’objectif du projet est conforme à l’objectif spécifique de la mesure 4.3 Economie imperméable dans le cadre de la RPOWŚ 2014-2020, à sa...
  • curprev 11:1411:14, 2 December 2021DG Regio talk contribs 13,316 bytes +137 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 13:0013:00, 21 October 2020DG Regio talk contribs 13,618 bytes +136 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 13:0013:00, 21 October 2020DG Regio talk contribs 13,482 bytes −121 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 13:0013:00, 21 October 2020DG Regio talk contribs 13,603 bytes +2,374 Created claim: summary (P836): The aim of the project is to organise water and sewage management in the district of Daleszyce through modernisation of the sewage treatment plant in the village of Marzysz connected with the reconstruction of the ACP iA system together with the replacement of technological equipment in the sewage treatment plant. The objective of the project is in line with the specific objective of Action 4.3 Water management within the framework of RPOWŚ 2014...
  • curprev 13:0013:00, 21 October 2020DG Regio talk contribs 11,229 bytes −1,886 Removed claim: summary (P836): The aim of the project is to structure the water and wastewater management in the area of the town of the High Seas by modernising the waste water treatment plant in the town of marysz in connection with the conversion of the AKPiA system, together with the replacement of the technological equipment in the waste water treatment plant. The project’s objective is part of the specific objective of Measure 4.3: ‘A majority proportion of the popula...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 12:4212:42, 10 March 2020DG Regio talk contribs 11,832 bytes +1,886 Created claim: summary (P836): The aim of the project is to structure the water and wastewater management in the area of the town of the High Seas by modernising the waste water treatment plant in the town of marysz in connection with the conversion of the AKPiA system, together with the replacement of the technological equipment in the waste water treatment plant. The project’s objective is part of the specific objective of Measure 4.3: ‘A majority proportion of the populati...

25 February 2020

18 February 2020

31 January 2020

14 January 2020