Revision history of "Comprehensive extension and reconstruction of sewage treatment plants and water and sewage networks in the Bogoria Agglomeration" (Q127779)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:1320:13, 2 March 2023DG Regio talk contribs 76,813 bytes +277 Changed label, description and/or aliases in ro, lv, fr, it, da, el, fi, es, cs, et, ga, sk, lt, hu, sv, de, hr, pt, bg, nl, sl, mt, and other parts

27 October 2022

26 October 2022

19 October 2022

27 July 2022

  • curprev 16:5316:53, 27 July 2022DG Regio talk contribs 74,419 bytes +47,648 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 11:1411:14, 2 December 2021DG Regio talk contribs 16,026 bytes +2,614 Created claim: summary (P836): L’objectif du projet est d’organiser la gestion de l’eau et des eaux usées dans la municipalité de Bogoria par la reconstruction d’une station d’épuration et la reconstruction du réseau d’eau et d’assainissement de l’agglomération. Le débit maximal de la station d’épuration des eaux usées est de 600 m³/j. L’objectif du projet est conforme à l’objectif spécifique de la mesure 4.3 Gestion étanche dans le cadre du RPOWŚ 2014-2020, à savoir: «Augmen...
  • curprev 11:1411:14, 2 December 2021DG Regio talk contribs 13,412 bytes +223 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 12:5912:59, 21 October 2020DG Regio talk contribs 13,628 bytes +188 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:5912:59, 21 October 2020DG Regio talk contribs 13,440 bytes −198 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:5912:59, 21 October 2020DG Regio talk contribs 13,638 bytes +2,323 Created claim: summary (P836): The project is designed to organise water and sewage management in the municipality of Bogoria by rebuilding the sewage treatment plant and rebuilding the water and sewage network in the agglomeration area. The maximum throughput of the sewage treatment plant is 600 m³/d. The project’s objective is in line with the specific objective of Measure 4.3 Water management within RPOWŚ 2014-2020, i.e. ‘Increased proportion of the population using a wast...
  • curprev 12:5912:59, 21 October 2020DG Regio talk contribs 11,315 bytes −1,705 Removed claim: summary (P836): The project aims to structure the water and wastewater management in the municipality of Bogoria by converting the wastewater treatment plant and converting the water and sewage systems in the agglomeration. The maximum capacity of the sewage treatment plant is 600 m³/d. ‘A majority proportion of the population using a waste water treatment system complying with the Urban Waste Water Directive’. The project activities contribute to removing ex...

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 12:4212:42, 10 March 2020DG Regio talk contribs 11,735 bytes +1,705 Created claim: summary (P836): The project aims to structure the water and wastewater management in the municipality of Bogoria by converting the wastewater treatment plant and converting the water and sewage systems in the agglomeration. The maximum capacity of the sewage treatment plant is 600 m³/d. ‘A majority proportion of the population using a waste water treatment system complying with the Urban Waste Water Directive’. The project activities contribute to removing exis...

25 February 2020

18 February 2020

31 January 2020

14 January 2020