Revision history of "Reconstruction and modernisation of the sewage treatment plant in Ożarów" (Q127774)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:3716:37, 10 October 2024DG Regio talk contribs 81,030 bytes −37 Set a claim value: summary (P836): O principal objetivo do projeto é modernizar a estação de tratamento de águas residuais, que consiste na construção de sistemas de drenagem e granulação de lamas de depuração na estação de tratamento de águas residuais de Ożarów. O objetivo será alcançado através de: 1. Substituição das instalações de drenagem de resíduos 2. Sistema de estabilização das lamas com silo para cal 3. Substituição de condutas tecnológicas e instalação do edifício 4. Expa...

7 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

19 October 2022

2 July 2022

  • curprev 21:3621:36, 2 July 2022DG Regio talk contribs 75,235 bytes +48,271 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 11:1911:19, 2 December 2021DG Regio talk contribs 16,186 bytes +2,687 Created claim: summary (P836): L’objectif principal du projet est la modernisation de la station d’épuration des eaux usées, qui consiste à construire des installations d’assèchement et de granulation des boues d’épuration de la station d’épuration des eaux usées d’Ożarów. L’objectif sera atteint par: 1. Remplacement de l’installation de drainage des déchets 2. Installation de stabilisation des boues avec silo de chaux 3. Remplacement de pipelines technologiques et d’installa...
  • curprev 11:1911:19, 2 December 2021DG Regio talk contribs 13,499 bytes +148 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 12:5912:59, 21 October 2020DG Regio talk contribs 13,790 bytes +133 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:5912:59, 21 October 2020DG Regio talk contribs 13,657 bytes −133 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:5912:59, 21 October 2020DG Regio talk contribs 13,790 bytes +2,412 Created claim: summary (P836): The main objective of the project is to modernise the sewage treatment plant consisting of the construction of drainage and granulation systems for sewage sludge on the sewage treatment plant in Ożarów. The objective will be achieved by: 1. Replacement of waste drainage installations 2. Sludge stabilisation system with silo for lime 3. Replacement of technological pipelines and installation of the building 4. Expansion of the drainage and stabil...
  • curprev 12:5912:59, 21 October 2020DG Regio talk contribs 11,378 bytes −2,020 Removed claim: summary (P836): The main objective of the project is to upgrade the waste water treatment plant to the construction of drainage and sewage sludge in the wastewater treatment plant in Ożarów. The objective will be achieved by: 1. The replacement of waste water treatment installations 2. Sludge stabilisation facilities with silo on lime 3. Exchange of technology pipelines and building installation 4. Building the drainage and stabilisation of the sludge 5. Inst...

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 12:4212:42, 10 March 2020DG Regio talk contribs 12,103 bytes +2,020 Created claim: summary (P836): The main objective of the project is to upgrade the waste water treatment plant to the construction of drainage and sewage sludge in the wastewater treatment plant in Ożarów. The objective will be achieved by: 1. The replacement of waste water treatment installations 2. Sludge stabilisation facilities with silo on lime 3. Exchange of technology pipelines and building installation 4. Building the drainage and stabilisation of the sludge 5. Instal...

25 February 2020

18 February 2020

31 January 2020

14 January 2020