Revision history of "Construction of sanitary sewage system in Miedziana Góra – Stage IV and extension of sewage treatment plant in Kostomłoty Second – Stage II" (Q127769)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:3716:37, 10 October 2024DG Regio talk contribs 93,206 bytes −11 Changed label, description and/or aliases in pt
  • curprev 16:3716:37, 10 October 2024DG Regio talk contribs 93,217 bytes −142 Set a claim value: summary (P836): O objetivo do projeto é aumentar a percentagem da população que utiliza um sistema de tratamento de águas residuais em conformidade com a Diretiva Águas Residuais Urbanas. O projeto consiste na continuação do saneamento da comuna de Miedziana Góra, que começou em 2001. A fase IV do sistema de esgotos sanitários será concluída (tarefa 1 a 8) na cidade de Miedzina Góra, Tumlin-Wykień, Cisova e Ćminsk, com 43,58 km de comprimento, incluindo: 38 km de c...

22 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:5219:52, 2 March 2023DG Regio talk contribs 90,185 bytes +2,078 Changed label, description and/or aliases in da, lv, sk, it, ro, fi, pt, ga, et, lt, es, hr, fr, el, nl, hu, sl, cs, bg, de, mt, sv, and other parts

27 October 2022

26 October 2022

19 October 2022

27 July 2022

  • curprev 16:5216:52, 27 July 2022DG Regio talk contribs 85,981 bytes +54,920 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 11:1911:19, 2 December 2021DG Regio talk contribs 17,706 bytes +3,209 Created claim: summary (P836): L’objectif du projet est d’augmenter la part de la population utilisant un système de traitement des eaux usées conformément à la directive relative aux eaux urbaines résiduaires. Le projet consiste à poursuivre l’assainissement de la municipalité de Miedziana Góra, qui a débuté en 2001. La phase IV du système d’assainissement sanitaire (tâches 1 à 8) sera achevée en mois.Miedziana Góra, Tumlin-Wykień, Cisowa et Omińsk l.43,58 km, y compris: Les...
  • curprev 11:1911:19, 2 December 2021DG Regio talk contribs 14,497 bytes +243 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 12:5912:59, 21 October 2020DG Regio talk contribs 14,693 bytes +205 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:5912:59, 21 October 2020DG Regio talk contribs 14,488 bytes −240 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:5912:59, 21 October 2020DG Regio talk contribs 14,728 bytes +2,724 Created claim: summary (P836): The aim of the project is to increase the proportion of the population using a waste water treatment system in accordance with the Urban Waste Water Directive. The project consists of the continuation of the sanitation of Miedziana Góra commune, which began in 2001. Stage IV of sanitary sewage system will be completed (Task 1 to 8) in the town of Miedzina Góra, Tumlin-Wykień, Cisova and Ćminsk length 43,58 km including: 38 km of gravitational du...
  • curprev 12:5912:59, 21 October 2020DG Regio talk contribs 12,004 bytes −2,430 Removed claim: summary (P836): The project aims to increase the share of the population benefiting from a waste water treatment system in line with the Urban Waste Water Directive. The project consists of the continuation of the sanitisation, launched in 2001, by the Municipality of Midzana Góra. A sanitary sewage system (Zadanie 1 to 8) in msc.Midziana Góra, Tumlin-Wykień, Ciosowa and Ćmińsk dł.43.58 km will be carried out, including: 38 km gravity canals, 5.3 km of pressu...

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 12:4212:42, 10 March 2020DG Regio talk contribs 13,143 bytes +2,430 Created claim: summary (P836): The project aims to increase the share of the population benefiting from a waste water treatment system in line with the Urban Waste Water Directive. The project consists of the continuation of the sanitisation, launched in 2001, by the Municipality of Midzana Góra. A sanitary sewage system (Zadanie 1 to 8) in msc.Midziana Góra, Tumlin-Wykień, Ciosowa and Ćmińsk dł.43.58 km will be carried out, including: 38 km gravity canals, 5.3 km of pressure...

25 February 2020

18 February 2020

31 January 2020

14 January 2020