Revision history of "Extension of sanitary sewage system – Stage V and extension and reconstruction of the water supply network in Miedziana Góra Municipality" (Q127762)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:4715:47, 7 October 2024DG Regio talk contribs 85,005 bytes +5 Changed label, description and/or aliases in pt
  • curprev 15:4715:47, 7 October 2024DG Regio talk contribs 85,000 bytes −69 Set a claim value: summary (P836): O objetivo do projeto é aumentar a percentagem da população que utiliza um sistema de tratamento de águas residuais em conformidade com a Diretiva Águas Residuais Urbanas.O objetivo do projeto é aumentar a percentagem da população que utiliza um sistema de tratamento de águas residuais em conformidade com a Diretiva Águas Residuais Urbanas.A fase V (tarefas 1 a 5) do sanit.(Tarefas 1 a 5) no Ministério da Economia.Potência, castor, receção e parte d...

23 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 22:3822:38, 2 March 2023DG Regio talk contribs 81,896 bytes +1,801 Changed label, description and/or aliases in da, it, et, el, hu, lv, lt, fr, hr, es, pt, ga, ro, fi, sv, cs, de, nl, sl, mt, sk, bg, and other parts

27 October 2022

26 October 2022

19 October 2022

2 July 2022

  • curprev 21:3621:36, 2 July 2022DG Regio talk contribs 77,970 bytes +49,656 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 11:1811:18, 2 December 2021DG Regio talk contribs 16,962 bytes +2,811 Created claim: summary (P836): L’objectif du projet est d’augmenter le pourcentage de la population utilisant le système de traitement des eaux usées conformément à la directive sur les eaux urbaines résiduaires. Phase V de la construction des égouts. assainissement. (tâches 1 à 5) à msc.Porzecze, Bobrza, réception et une partie de la station d’égouts 25,09 km dans tym:22,20 km conduits gravitationnels, 2,37 km canaux de décharge, 0,52 km canal de pression. 5 stations de pomp...
  • curprev 11:1811:18, 2 December 2021DG Regio talk contribs 14,151 bytes +231 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 12:5912:59, 21 October 2020DG Regio talk contribs 14,359 bytes +200 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:5912:59, 21 October 2020DG Regio talk contribs 14,159 bytes −213 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:5912:59, 21 October 2020DG Regio talk contribs 14,372 bytes +2,482 Created claim: summary (P836): The aim of the project is to increase the percentage of the population using a sewage treatment system in accordance with the directive on municipal waste water.The aim of the project is to increase the percentage of the population using sewage treatment system in accordance with the directive on municipal wastewater.The Stage V bud. sanit.(Tasks 1 to 5) in the Ministry of Economy.Power, beaver, reception and part of Ćmińska tubes length 25.09 k...
  • curprev 12:5912:59, 21 October 2020DG Regio talk contribs 11,890 bytes −1,748 Removed claim: summary (P836): The aim of the project is to increase the share of the population using a waste water treatment system compliant with the Urban Waste Water Directive. Water supply network to be developed 1.7 km, and the said water supply network in msc.Bobza, Przyjojsk, to the length of the 8.00 km (Tasks 1 to 6).3 retention tanks will be removed, a power generator will be purchased to the water station. There will be an overview of the municipality in the ar...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 12:4212:42, 10 March 2020DG Regio talk contribs 12,348 bytes +1,748 Created claim: summary (P836): The aim of the project is to increase the share of the population using a waste water treatment system compliant with the Urban Waste Water Directive. Water supply network to be developed 1.7 km, and the said water supply network in msc.Bobza, Przyjojsk, to the length of the 8.00 km (Tasks 1 to 6).3 retention tanks will be removed, a power generator will be purchased to the water station. There will be an overview of the municipality in the area...

25 February 2020

18 February 2020

31 January 2020

14 January 2020