Revision history of "Modernisation of street lighting in Sitkówka-Nowiny commune – ETAP III." (Q127717)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:2718:27, 9 October 2024DG Regio talk contribs 85,743 bytes +2 Changed label, description and/or aliases in pt
  • curprev 18:2718:27, 9 October 2024DG Regio talk contribs 85,741 bytes +36 Set a claim value: summary (P836): No âmbito deste investimento, está prevista a próxima fase de modernização parcial da iluminação na zona de Sitkówka-Nowina, que consiste na substituição, nos 335 pontos indicados, das luminárias de iluminação pública existentes para luminárias LED modernas do tipo 30 W-70 W por um sistema de redução de potência, na substituição de lanças e na instalação de três lâmpadas híbridas alimentadas por turbinas eólicas e células fotovoltaicas. Note-se que...

22 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

19 October 2022

2 July 2022

  • curprev 21:3521:35, 2 July 2022DG Regio talk contribs 82,143 bytes +52,921 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, en, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 11:1711:17, 2 December 2021DG Regio talk contribs 17,043 bytes +2,994 Created claim: summary (P836): Dans le cadre de cet investissement, l’étape suivante de la modernisation partielle de l’éclairage dans la zone de Sitkówka-Nowiny est prévue: remplacement des luminaires existants dans la technologie LED 30 W-70 W par un système de réduction de la puissance, remplacement des flèches et installation de trois lampes hybrides alimentées par éolienne et cellules photovoltaïques aux 335 points d’éclairage public indiqués. Il est mentionné que ce pro...
  • curprev 11:1711:17, 2 December 2021DG Regio talk contribs 14,049 bytes +153 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 12:5812:58, 21 October 2020DG Regio talk contribs 14,314 bytes +133 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:5812:58, 21 October 2020DG Regio talk contribs 14,181 bytes −143 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:5812:58, 21 October 2020DG Regio talk contribs 14,324 bytes +2,717 Created claim: summary (P836): As part of this investment, the next stage of partial modernisation of lighting in the Sitkówka-Nowina area is planned, consisting of replacing at the indicated 335 points of street lighting existing luminaires for modern LED luminaires type 30 W-70 W with a power reduction system, replacement of booms and installation of three hybrid lamps powered from wind turbine and photovoltaic cells. It is noted that this project is named ETAP III and is a...
  • curprev 12:5812:58, 21 October 2020DG Regio talk contribs 11,607 bytes −2,184 Removed claim: summary (P836): This investment is planning a further phase of partial modernisation of the lighting in the Gm. Sitkowa-Nowiny, which consists of replacing the existing 335W-30W luminaires with modern luminaires for W-70W LED light fittings with a power reduction system, the replacement of jibs and the installation of three hybrid lamps powered from wind turbine and photovoltaic cells. It is added that this project is under the title of ETAP III and is a cont...

15 October 2020

24 September 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 12:3712:37, 10 March 2020DG Regio talk contribs 12,500 bytes +2,184 Created claim: summary (P836): This investment is planning a further phase of partial modernisation of the lighting in the Gm. Sitkowa-Nowiny, which consists of replacing the existing 335W-30W luminaires with modern luminaires for W-70W LED light fittings with a power reduction system, the replacement of jibs and the installation of three hybrid lamps powered from wind turbine and photovoltaic cells. It is added that this project is under the title of ETAP III and is a contin...

25 February 2020

18 February 2020

31 January 2020

14 January 2020