Revision history of "Improving the energy efficiency of the building of the Municipal Office in Opatowiec" (Q127668)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:4318:43, 8 October 2024DG Regio talk contribs 87,786 bytes +15 Set a claim value: summary (P836): O principal objetivo do projeto é melhorar a qualidade do ar no município de Opatowiec, reduzindo a poluição atmosférica e aumentando a eficiência energética do edifício do Gabinete Municipal de Opatowiec. O projeto prevê a realização das seguintes atividades: modernização do sistema de CO, aquecimento – piso no solo, aquecimento do telhado, substituição de portas, instalação de painéis fotovoltaicos, substituição da iluminação. O âmbito dos trabalh...

22 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

19 October 2022

2 July 2022

  • curprev 21:3421:34, 2 July 2022DG Regio talk contribs 83,704 bytes +54,266 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 11:1811:18, 2 December 2021DG Regio talk contribs 17,175 bytes +3,030 Created claim: summary (P836): L’objectif principal du projet est d’améliorer la qualité de l’air dans la municipalité d’Opatowiec en réduisant la pollution atmosphérique et en augmentant l’efficacité énergétique de la construction du bureau municipal d’Opatowiec. Le projet prévoit la mise en œuvre des activités suivantes: modernisation de l’installation de CO, chauffage — plancher au sol, réchauffement du toit, remplacement des portes, installation de panneaux photovoltaïque...
  • curprev 11:1811:18, 2 December 2021DG Regio talk contribs 14,145 bytes +155 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 12:1712:17, 21 October 2020DG Regio talk contribs 14,429 bytes +143 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:1712:17, 21 October 2020DG Regio talk contribs 14,286 bytes −140 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:1712:17, 21 October 2020DG Regio talk contribs 14,426 bytes +2,691 Created claim: summary (P836): The main objective of the project is to improve air quality in the Opatowiec Municipality by reducing pollution into the atmosphere and increasing the energy efficiency of the building of the Municipal Office in Opatowiec. The project envisages the implementation of the following activities: modernisation of the CO system, warming – floor on the ground, roof warming, replacement of doors, installation of photovoltaic panels, replacement of light...
  • curprev 12:1712:17, 21 October 2020DG Regio talk contribs 11,735 bytes −2,191 Removed claim: summary (P836): The main objective of the project is to improve air quality in the municipality of Opatowiec by reducing atmospheric pollution and increasing the energy efficiency of the Opatovac building. The project involves carrying out the following activities: modernisation of CO, insulation — ground floor, roof insulation, replacement of doors, installation of solar panels, replacement of lighting. The scope of the work is the result of an audit. After...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 12:3712:37, 10 March 2020DG Regio talk contribs 12,653 bytes +2,191 Created claim: summary (P836): The main objective of the project is to improve air quality in the municipality of Opatowiec by reducing atmospheric pollution and increasing the energy efficiency of the Opatovac building. The project involves carrying out the following activities: modernisation of CO, insulation — ground floor, roof insulation, replacement of doors, installation of solar panels, replacement of lighting. The scope of the work is the result of an audit. After co...

25 February 2020

18 February 2020

31 January 2020

14 January 2020