Revision history of "Thermal modernisation of the guard building of the OSP in Koniemłoty" (Q127651)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:3716:37, 10 October 2024DG Regio talk contribs 91,782 bytes +6 Changed label, description and/or aliases in pt
  • curprev 16:3716:37, 10 October 2024DG Regio talk contribs 91,776 bytes +18 Set a claim value: summary (P836): O principal objetivo do projeto é aumentar a eficiência energética dos edifícios públicos. O investimento está em conformidade com o objetivo específico da medida 3.3 «Melhorar os efeitos». Energy. from the use of renewable energy sources in the publ. and residential sector, Axis priory.3. Energia eficiente e verde, em que está prevista a possibilidade de dofinan. projectos destinados a aumentar os resultados. Energia. Edifícios públicos. O projeto...

20 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:4519:45, 2 March 2023DG Regio talk contribs 89,361 bytes −41 Changed label, description and/or aliases in sk, lv, it, da, et, fi, bg, sl, fr, hu, ga, ro, cs, es, pt, nl, lt, sv, el, de, hr, mt, and other parts

27 October 2022

26 October 2022

19 October 2022

2 July 2022

  • curprev 21:3421:34, 2 July 2022DG Regio talk contribs 87,283 bytes +57,245 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 11:1711:17, 2 December 2021DG Regio talk contribs 17,527 bytes +3,217 Created claim: summary (P836): L’objectif principal du projet est d’accroître l’efficacité énergétique des bâtiments publics. L’investissement fait partie de l’objectif spécifique de la mesure 3.3 Améliorer les résultats. Energ. avec l’utilisation de sources d’énergie renouvelables dans le secteur du publ. et des soufflets, Axe Priorité.3. Une énergie efficace et verte, où il est possible de cofinancer des projets visant à accroître l’impact. Énergie des bâtiments publics. Le...
  • curprev 11:1711:17, 2 December 2021DG Regio talk contribs 14,310 bytes +125 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 12:1612:16, 21 October 2020DG Regio talk contribs 14,624 bytes +128 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:1612:16, 21 October 2020DG Regio talk contribs 14,496 bytes −126 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:1612:16, 21 October 2020DG Regio talk contribs 14,622 bytes +2,842 Created claim: summary (P836): The main objective of the project is to increase the energy efficiency of public buildings. The investment is in line with the specific objective of Measure 3.3 Improving effects. Energy. from the use of renewable energy sources in the publ. and residential sector, Axis priory.3. Efficient and green energy, where the possibility of dofinan. projects aimed at increasing results is foreseen. Energy. Public buildings. The project will be implemente...
  • curprev 12:1612:16, 21 October 2020DG Regio talk contribs 11,780 bytes −2,621 Removed claim: summary (P836): The main objective of the project is to increase the energy efficiency of buildings of general interest. The investment is part of the specific objective of Measure 3.3. Energy from renewable energy sources in the pul sector and in the population., Osi priorit.3. Efficient and green energy with the possibility of financing projects to increase the impact. Buildings of general interest. The project will be implemented in the following period: A...

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 12:3612:36, 10 March 2020DG Regio talk contribs 13,106 bytes +2,621 Created claim: summary (P836): The main objective of the project is to increase the energy efficiency of buildings of general interest. The investment is part of the specific objective of Measure 3.3. Energy from renewable energy sources in the pul sector and in the population., Osi priorit.3. Efficient and green energy with the possibility of financing projects to increase the impact. Buildings of general interest. The project will be implemented in the following period: And...

25 February 2020

18 February 2020

31 January 2020

14 January 2020