Revision history of "THERMAL MODERNISATION OF THE SCHOOL BUILDING AT UL. GREY SERIALS 6 IN SUCHEDNIOW" (Q127625)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:1220:12, 2 March 2023DG Regio talk contribs 87,653 bytes −2,204 Changed label, description and/or aliases in lv, it, da, sk, ro, cs, pt, de, sv, et, lt, sl, ga, bg, es, hu, fr, hr, mt, fi, el, nl, and other parts

27 October 2022

26 October 2022

19 October 2022

2 July 2022

  • curprev 21:3321:33, 2 July 2022DG Regio talk contribs 87,738 bytes +58,058 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 11:1611:16, 2 December 2021DG Regio talk contribs 17,399 bytes +3,040 Created claim: summary (P836): Conformément aux audits de l’énergie et de l’efficacité énergétique, les travaux prévus comprennent la modernisation des cloisons: Plafond extérieur — épaisseur requise de la couche d’isolation thermique: 24 cm — DACH, Mur extérieur — épaisseur requise de la couche d’isolation thermique: 16 cm — FASADA, Hall extérieur — épaisseur requise. Couche isolante thermique: 9 cm — FASADA, Plafond extérieur — épaisseur requise de la couche d’isolation the...
  • curprev 11:1611:16, 2 December 2021DG Regio talk contribs 14,359 bytes +139 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 12:1612:16, 21 October 2020DG Regio talk contribs 14,659 bytes +139 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:1612:16, 21 October 2020DG Regio talk contribs 14,520 bytes −139 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:1612:16, 21 October 2020DG Regio talk contribs 14,659 bytes +2,821 Created claim: summary (P836): According to energy audits and energy efficiency, the planned scope of work includes the modernisation of partitions: Outer ceiling – required thickness of the thermal insulation layer: 24 cm – DACH, Outside wall – required thermal insulation layer thickness: 16 cm – facade, outer wall hall – required thickness. thermal insulation layer: 9 cm – facade, outer ceiling hall – required thickness of thermal insulation layer: 13 cm – DACH and modernis...
  • curprev 12:1612:16, 21 October 2020DG Regio talk contribs 11,838 bytes −2,336 Removed claim: summary (P836): In line with energy audits and energy efficiency, the planned scope of work includes modernisation of partitions: Outer ceiling: thickness of the thermal insulation layer required: 24 cm — DACH, External Stricent — required thickness of the thermal insulation layer: 16 cm — FASADA, Strict, external floor plate: 9 cm — FASADA, external hall — required thickness of the thermal insulation layer: 13 cm — ACH and modernisation of compartment: windo...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 12:3612:36, 10 March 2020DG Regio talk contribs 12,890 bytes +2,336 Created claim: summary (P836): In line with energy audits and energy efficiency, the planned scope of work includes modernisation of partitions: Outer ceiling: thickness of the thermal insulation layer required: 24 cm — DACH, External Stricent — required thickness of the thermal insulation layer: 16 cm — FASADA, Strict, external floor plate: 9 cm — FASADA, external hall — required thickness of the thermal insulation layer: 13 cm — ACH and modernisation of compartment: window...

25 February 2020

18 February 2020

31 January 2020

14 January 2020