Revision history of "Improving energy efficiency through thermal modernisation of the butchery building and modernisation of production lines for the production of sausages and energy extraction from photovoltaic micro-installation installed on the roof of the facility" (Q127566)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:4218:42, 8 October 2024DG Regio talk contribs 84,841 bytes −7 Changed label, description and/or aliases in pt
  • curprev 18:4218:42, 8 October 2024DG Regio talk contribs 84,848 bytes −29 Set a claim value: summary (P836): O objetivo do projeto é aumentar a eficiência energética da empresa e obter energia a partir de FER através de obras de modernização térmica do edifício (isolamento do casco, paredes externas, melhoria dos sistemas de aquecimento e de aquecimento), modernização das linhas de produção (compra de máquinas) e instalação de instalações fotovoltaicas de 30 kW. Período de execução: 01.03.2017-31.08.2018. As ações resultam de PGN para MiG Stasz. O projeto...

23 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:1220:12, 2 March 2023DG Regio talk contribs 82,480 bytes +1,446 Changed label, description and/or aliases in lv, da, it, sk, ga, de, cs, et, mt, fi, bg, es, ro, sv, hr, pt, sl, nl, fr, hu, lt, el, and other parts

27 October 2022

26 October 2022

19 October 2022

27 July 2022

  • curprev 16:5016:50, 27 July 2022DG Regio talk contribs 78,917 bytes +50,697 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 11:1611:16, 2 December 2021DG Regio talk contribs 16,678 bytes +2,662 Created claim: summary (P836): L’objectif du projet est d’accroître l’efficacité énergétique de l’entreprise et d’obtenir de l’énergie des SER par des travaux de modernisation thermique du bâtiment (c’est-à-dire isolation du toit, murs extérieurs, amélioration du système de chauffage et de stockage), modernisation des lignes de production (achat de machines) et installation de l’installation photovoltaïque de 30 kW. Période realizacji:01.03.2017-31.08.2018 Les actions résulte...
  • curprev 11:1611:16, 2 December 2021DG Regio talk contribs 14,016 bytes +369 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 11:5011:50, 21 October 2020DG Regio talk contribs 14,086 bytes +308 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:5011:50, 21 October 2020DG Regio talk contribs 13,778 bytes −325 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:5011:50, 21 October 2020DG Regio talk contribs 14,103 bytes +2,342 Created claim: summary (P836): The aim of the project is to increase the company’s energy efficiency and obtain energy from RES through thermal modernisation works of the building (hoof insulation, external walls, improvement of heating and heating systems), modernisation of production lines (purchase of machines) and installation of photovoltaic installation of 30 kW. Implementation period:01.03.2017-31.08.2018. The actions result from PGN for MiG Stasz. The project is in ac...
  • curprev 11:5011:50, 21 October 2020DG Regio talk contribs 11,761 bytes −1,951 Removed claim: summary (P836): The aim of the project is to increase the energy efficiency of the company and to obtain energy from RES by means of thermal modernisation of the building (insulation of the roof, external walls, improvement of the heating system and CWU.), modernisation of production lines (purchase of machinery) and installation of the photovoltaic installation 30 kW. Realizacji:01.03.2017-31.08.2018. The measures stem from the PGN for MIG Staszow. The proje...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 12:3912:39, 10 March 2020DG Regio talk contribs 12,437 bytes +1,951 Created claim: summary (P836): The aim of the project is to increase the energy efficiency of the company and to obtain energy from RES by means of thermal modernisation of the building (insulation of the roof, external walls, improvement of the heating system and CWU.), modernisation of production lines (purchase of machinery) and installation of the photovoltaic installation 30 kW. Realizacji:01.03.2017-31.08.2018. The measures stem from the PGN for MIG Staszow. The project...

25 February 2020

18 February 2020

31 January 2020

14 January 2020