Revision history of "Installation of Renewable Energy Sources (PV panels, air heat pumps) in the ZOZ in Końskie" (Q127514)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:4715:47, 7 October 2024DG Regio talk contribs 89,468 bytes +7 Changed label, description and/or aliases in pt
  • curprev 15:4715:47, 7 October 2024DG Regio talk contribs 89,461 bytes +4 Set a claim value: summary (P836): O objeto do projeto é a montagem de fontes de energia renováveis em edifícios e no ZOZ em Końskie. O âmbito do projeto deve incluir: — instalação de painéis fotovoltaicos — 1668 unidades de módulos monocristalinos com uma potência unitária de 300 kWp cada. Capacidade total da instalação prevista: 500,4 kW; — instalação de bombas de calor de ar para aquecimento central e de água quente. Todos os trabalhos de investimento serão realizados de acordo co...

20 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:1220:12, 2 March 2023DG Regio talk contribs 87,060 bytes −298 Changed label, description and/or aliases in ro, it, lv, da, el, fi, es, cs, et, ga, sk, lt, hu, pt, sv, hr, de, bg, nl, sl, mt, and other parts

27 October 2022

26 October 2022

19 October 2022

2 July 2022

  • curprev 21:3021:30, 2 July 2022DG Regio talk contribs 85,234 bytes +55,419 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 09:1709:17, 2 December 2021DG Regio talk contribs 17,384 bytes +3,107 Created claim: summary (P836): Le projet a pour objet l’installation de sources d’énergie renouvelables dans les bâtiments et dans la ZOZ à Końskie. La portée du projet comprend: — installation de panneaux photovoltaïques — 1668 unités de modules monocristallins d’une puissance unitaire de 300 kWp chacun. Capacité totale d’installation prévue: 500,4 kW; — installation de pompes à chaleur à air pour le chauffage du chauffage central et du chauffage de l’eau chaude. Tous les tr...
  • curprev 09:1709:17, 2 December 2021DG Regio talk contribs 14,277 bytes +183 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 11:4811:48, 21 October 2020DG Regio talk contribs 14,533 bytes +150 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:4811:48, 21 October 2020DG Regio talk contribs 14,383 bytes −145 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:4811:48, 21 October 2020DG Regio talk contribs 14,528 bytes +2,704 Created claim: summary (P836): The subject of the project is the assembly of renewable energy sources in buildings and in the ZOZ in Końskie. The scope of the project shall include: — installation of photovoltaic panels – 1668 units of monocrystalline modules with unit power of 300 kWp each. Total capacity of the planned installation: 500,4 kW; — installation of air heat pumps for heating central heating and hot water. All investment works will be carried out according to the...
  • curprev 11:4811:48, 21 October 2020DG Regio talk contribs 11,824 bytes −2,276 Removed claim: summary (P836): The project involves the installation of renewable energy sources in buildings and in the ZOZ in Końskie. The project includes: Installation of photovoltaic panels — 1668 single crystal modules with a unit capacity of 300 kWp each. Total planned installation capacity: 500.4 kW; — the installation of air heat pumps for heating c.o and c.w..All investment works will be carried out in accordance with an effective and financial schedule. For econo...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 12:3312:33, 10 March 2020DG Regio talk contribs 12,807 bytes +2,276 Created claim: summary (P836): The project involves the installation of renewable energy sources in buildings and in the ZOZ in Końskie. The project includes: Installation of photovoltaic panels — 1668 single crystal modules with a unit capacity of 300 kWp each. Total planned installation capacity: 500.4 kW; — the installation of air heat pumps for heating c.o and c.w..All investment works will be carried out in accordance with an effective and financial schedule. For economi...

25 February 2020

18 February 2020

31 January 2020

14 January 2020