Revision history of "Diversification of the company’s activities through the purchase of innovative fixed assets and the introduction of new products and services as a result of innovative technological processes related to the drying process of wood." (Q127363)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:2618:26, 9 October 2024DG Regio talk contribs 94,459 bytes −7 Changed label, description and/or aliases in pt
  • curprev 18:2618:26, 9 October 2024DG Regio talk contribs 94,466 bytes −9 Set a claim value: summary (P836): Presumo que o projeto esteja a decorrer no período de 01.04.2017-28.02.2018. O projecto consistirá em duas tarefas, tal como apresento no calendário financeiro, a saber: aquisição de um secador a vácuo SP 10 – até 10 m3 de madeira e aquisição de uma instalação fotovoltaica com uma potência de 20,80 kWp. O projeto alcançará os seguintes indicadores: Número de postos de trabalho mantidos [CPE] – 2,00; Aumento do emprego nas empresas apoiadas (IC 8) EP...

20 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 16:4216:42, 2 March 2023DG Regio talk contribs 92,078 bytes +558 Changed label, description and/or aliases in lv, da, it, bg, sk, et, ro, pt, hr, hu, cs, fr, sv, es, lt, de, ga, nl, sl, fi, mt, el, and other parts

27 October 2022

26 October 2022

19 October 2022

2 July 2022

  • curprev 21:2821:28, 2 July 2022DG Regio talk contribs 89,398 bytes +58,270 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 09:1309:13, 2 December 2021DG Regio talk contribs 17,929 bytes +3,181 Created claim: summary (P836): Je suppose que le projet est en cours de réalisation entre le 01.04.2017 et le 28.02.2018. Le projet comprendra deux tâches, telles que je le présente dans le calendrier réel et financier, à savoir: achat d’un sécheur sous vide SP 10 — jusqu’à 10 m³ de bois et achat d’une installation photovoltaïque d’une puissance de 20,80 kWp. Le projet permettra d’atteindre les indicateurs suivants: Nombre d’emplois maintenus [ETP] — 2,00; Croissance de l’emp...
  • curprev 09:1309:13, 2 December 2021DG Regio talk contribs 14,748 bytes +305 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 11:1911:19, 21 October 2020DG Regio talk contribs 14,882 bytes +292 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:1911:19, 21 October 2020DG Regio talk contribs 14,590 bytes −329 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:1911:19, 21 October 2020DG Regio talk contribs 14,919 bytes +2,782 Created claim: summary (P836): I assume running the project in the period 01.04.2017-28.02.2018. The project will consist of two tasks, as I present in the Financial Schedule., i.e.: purchase of a vacuum dryer SP 10 – up to 10 m³ of wood and purchase of a photovoltaic installation with a power of 20.80 kWp. The project will achieve the following indicators: Number of jobs maintained [EPC] – 2,00; Increased employment in supported enterprises (CI 8) EPC 2.00; Number of product...
  • curprev 11:1911:19, 21 October 2020DG Regio talk contribs 12,137 bytes −2,176 Removed claim: summary (P836): I am planning to run a project in the period 01.04.2017-28.02.2018. The project will consist of two tasks, as set out in the material and financial schedule, namely: purchase of 10-10 m³ of wood and 20,80 kWp. The project will reach indicators: Jobs maintained [FTE] — 2,00; Employment growth in supported enterprises (CI 8) EPC 2,00; Number of product innovations introduced 1,00 Number of process innovations 1,00. The project is in line with th...

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 12:3412:34, 10 March 2020DG Regio talk contribs 13,020 bytes +2,176 Created claim: summary (P836): I am planning to run a project in the period 01.04.2017-28.02.2018. The project will consist of two tasks, as set out in the material and financial schedule, namely: purchase of 10-10 m³ of wood and 20,80 kWp. The project will reach indicators: Jobs maintained [FTE] — 2,00; Employment growth in supported enterprises (CI 8) EPC 2,00; Number of product innovations introduced 1,00 Number of process innovations 1,00. The project is in line with the...

25 February 2020

18 February 2020

31 January 2020

14 January 2020