Revision history of "Construction of Kindergarten No. 2 in Ljubljana." (Q127001)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:2518:25, 9 October 2024DG Regio talk contribs 57,318 bytes −1 Changed label, description and/or aliases in pt
  • curprev 18:2518:25, 9 October 2024DG Regio talk contribs 57,319 bytes −11 Set a claim value: summary (P836): O escopo do projeto inclui a adição ao edifício existente, que atualmente abriga uma escola primária, uma nova seção (segmento), que incluirá novos ramos pré-escolares e ramos da escola primária. O projeto prevê a localização de um jardim de infância no rés-do-chão do edifício. O jardim-de-infância terá uma entrada separada. Haverá um parque infantil ao lado da entrada. Parâmetros técnicos básicos (pré-escolar + ensino primário): Área da expansão pr...

20 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

20 October 2022

27 July 2022

  • curprev 16:4016:40, 27 July 2022DG Regio talk contribs 52,764 bytes +32,154 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 08:4308:43, 2 December 2021DG Regio talk contribs 13,531 bytes +1,741 Created claim: summary (P836): La portée du projet comprend l’ajout au bâtiment existant, qui abrite actuellement l’école primaire, une nouvelle partie (segment) qui comprendra, entre autres, de nouveaux départements préscolaires et des branches de l’école primaire. Le projet prévoit l’emplacement d’un jardin d’enfants au rez-de-chaussée du bâtiment. La maternelle aura une entrée séparée. Une aire de jeux sera située à côté de l’entrée. Paramètres techniques de base (école ma...
  • curprev 08:4308:43, 2 December 2021DG Regio talk contribs 11,790 bytes +116 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 10:5810:58, 21 October 2020DG Regio talk contribs 12,113 bytes +107 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:5810:58, 21 October 2020DG Regio talk contribs 12,006 bytes −87 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:5810:58, 21 October 2020DG Regio talk contribs 12,093 bytes +1,626 Created claim: summary (P836): The scope of the project includes the addition to the existing building, which currently houses a primary school, a new section (segment), which will include new preschool branches and branches of primary school. The project provides for the location of a kindergarten on the ground floor of the building. The kindergarten will have a separate entrance. There will be a playground next to the entrance. Basic technical parameters (pre-school + prima...
  • curprev 10:5810:58, 21 October 2020DG Regio talk contribs 10,467 bytes −1,175 Removed claim: summary (P836): The scope of the project involves the completion of the existing building where the primary school is currently located, the new part (segment), which includes new nursery and primary school branches. The project foresees the location of the nursery in the ground floor of the building. A pre-school will have a separate entrance. A playground will be located next to the entrance. Basic technical parameters (pre-school + primary school): Built a...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 12:5012:50, 10 March 2020DG Regio talk contribs 10,360 bytes +1,175 Created claim: summary (P836): The scope of the project involves the completion of the existing building where the primary school is currently located, the new part (segment), which includes new nursery and primary school branches. The project foresees the location of the nursery in the ground floor of the building. A pre-school will have a separate entrance. A playground will be located next to the entrance. Basic technical parameters (pre-school + primary school): Built are...

25 February 2020

18 February 2020

31 January 2020

14 January 2020