Revision history of "Construction of a kindergarten in Psarach." (Q126976)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2106:21, 9 October 2024DG Regio talk contribs 52,749 bytes +2 Changed label, description and/or aliases in pt
  • curprev 06:2106:21, 9 October 2024DG Regio talk contribs 52,747 bytes −24 Set a claim value: summary (P836): O projeto visa aumentar o número de lugares pré-escolares na comuna de Psary, expandindo a infraestrutura pré-escolar em Psary. Este projeto abrange obras de construção relacionadas com as instalações do jardim de infância com infraestruturas técnicas e elevador num edifício recém-construído. Como resultado deste projecto, serão criados três grupos pré-escolares para crianças em 3-4 anos (60 novos lugares pré-escolares para esta faixa etária). Graça...

23 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

20 October 2022

27 July 2022

  • curprev 16:4016:40, 27 July 2022DG Regio talk contribs 47,960 bytes +28,708 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 08:4208:42, 2 December 2021DG Regio talk contribs 12,932 bytes +1,501 Created claim: summary (P836): Le projet vise à augmenter le nombre de places préscolaires dans la municipalité de Psary en étendant l’infrastructure préscolaire du Psary. Ce projet couvre les travaux de construction liés à la pépinière ainsi que l’infrastructure technique et l’ascenseur du bâtiment nouvellement construit. Grâce à ce projet, trois groupes préscolaires seront créés pour les enfants de 3 à 4 ans (60 nouveaux établissements préscolaires pour ce groupe d’âge). Gr...
  • curprev 08:4208:42, 2 December 2021DG Regio talk contribs 11,431 bytes +107 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 12:4312:43, 21 October 2020DG Regio talk contribs 11,763 bytes +101 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:4312:43, 21 October 2020DG Regio talk contribs 11,662 bytes −95 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:4312:43, 21 October 2020DG Regio talk contribs 11,757 bytes +1,414 Created claim: summary (P836): The project aims to increase the number of preschool places in the Psary commune by expanding preschool infrastructure in Psary. This project covers construction works related to the kindergarten premises with technical infrastructure and elevator in a newly built building. As a result of this project, three preschool groups for children in 3-4 years will be created (60 new preschool places for this age group). Thanks to the implementation of th...
  • curprev 12:4312:43, 21 October 2020DG Regio talk contribs 10,343 bytes −1,040 Removed claim: summary (P836): The project aims to increase the number of pre-school facilities in the municipality of Psary by expanding the pre-school infrastructure in the Psary. This project involves the construction works related to the nursery area together with the technical infrastructure and the building in the newly built building. As a result of this project, three pre-school groups will be set up for children in many 3-4 years (60 new pre-school places for this...

24 September 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 12:5012:50, 10 March 2020DG Regio talk contribs 10,098 bytes +1,040 Created claim: summary (P836): The project aims to increase the number of pre-school facilities in the municipality of Psary by expanding the pre-school infrastructure in the Psary. This project involves the construction works related to the nursery area together with the technical infrastructure and the building in the newly built building. As a result of this project, three pre-school groups will be set up for children in many 3-4 years (60 new pre-school places for this ag...

25 February 2020

18 February 2020

31 January 2020

14 January 2020