Revision history of "Reconstruction and extension of the building of the Old Częstochowa Town Hall with land development" (Q126115)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:0920:09, 2 March 2023DG Regio talk contribs 63,207 bytes +563 Changed label, description and/or aliases in sk, it, lv, da, fi, et, ga, fr, ro, sv, bg, de, hu, cs, sl, mt, es, pt, lt, nl, hr, el, and other parts

27 October 2022

26 October 2022

21 October 2022

2 July 2022

  • curprev 21:0021:00, 2 July 2022DG Regio talk contribs 60,539 bytes +37,664 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 08:3008:30, 2 December 2021DG Regio talk contribs 14,408 bytes +1,976 Created claim: summary (P836): Le projet comprend la reconstruction et l’extension de l’ancienne mairie pour les besoins du musée archéologique et historique avec une partie de service (café, toilettes publiques) et la modernisation de la place du Vieux Marché. L’attraction principale sera l’équilibre des sculptures de l’artiste mondialement célèbre Jerzy Kędziora. L’espace du marché sera équipé d’une petite architecture pour les loisirs et les loisirs: ceinture à eau, siège...
  • curprev 08:3008:30, 2 December 2021DG Regio talk contribs 12,432 bytes +162 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 10:5010:50, 21 October 2020DG Regio talk contribs 12,709 bytes +160 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:5010:50, 21 October 2020DG Regio talk contribs 12,549 bytes −168 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:5010:50, 21 October 2020DG Regio talk contribs 12,717 bytes +1,862 Created claim: summary (P836): The project includes the reconstruction and extension of the former Town Hall for the needs of an archaeological and historical museum with a service area (café, public toilets) and modernisation of the Old Market Square. The main attraction will be sculptures balancing the artist of the world famous Jerzy Kędziora. The market space will be equipped with a small architecture for leisure and recreation: water belt, seating and green. The amphithe...
  • curprev 10:5010:50, 21 October 2020DG Regio talk contribs 10,855 bytes −1,447 Removed claim: summary (P836): The project involves the reconstruction and extension of the former archaeological site to the needs of the archaeological and historical museum with the service section (cafeteria, public toilets) and the renewal of the Old Market board. The main attraction will be the sculpture of the world-renowned Jerzy Kędzin, the artist in the world. The market will be equipped with a small architecture for recreation and recreation: water, seat and gree...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 10:1510:15, 10 March 2020DG Regio talk contribs 11,016 bytes +1,447 Created claim: summary (P836): The project involves the reconstruction and extension of the former archaeological site to the needs of the archaeological and historical museum with the service section (cafeteria, public toilets) and the renewal of the Old Market board. The main attraction will be the sculpture of the world-renowned Jerzy Kędzin, the artist in the world. The market will be equipped with a small architecture for recreation and recreation: water, seat and green....

25 February 2020

18 February 2020

31 January 2020

14 January 2020