Revision history of "Improving safety around the main promenade of the city – land development ul. The long one in Raciborz" (Q126105)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:0704:07, 11 October 2024DG Regio talk contribs 65,716 bytes −16 Changed label, description and/or aliases in pt
  • curprev 04:0704:07, 11 October 2024DG Regio talk contribs 65,732 bytes −26 Set a claim value: summary (P836): O projeto inclui a reconstrução da Rua Długa, desde a Praça do Mercado até à Praça da Duquesa de Piastówny. Assume-se a demolição de canteiros, escadas e rampas de lançamento existentes. Haverá uma faixa de elevação ao longo dos edifícios no lado norte da rua. O nível superior da rua será liderado por uma escada agitada semelhante à margem do rio e rampas para pessoas com deficiência localizadas em ambos os lados da elevação. Serão montados bancos d...

12 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:0920:09, 2 March 2023DG Regio talk contribs 63,362 bytes +945 Changed label, description and/or aliases in lv, it, da, sk, lt, pt, sv, ro, hu, de, ga, bg, es, fr, fi, et, el, nl, hr, sl, cs, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

2 July 2022

  • curprev 21:0021:00, 2 July 2022DG Regio talk contribs 60,307 bytes +37,490 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 08:3008:30, 2 December 2021DG Regio talk contribs 14,415 bytes +1,954 Created claim: summary (P836): Le projet comprend la reconstruction de la rue Długa de la place du marché à la place de la duchesse Ofka Piastówny. On suppose que les parterres de fleurs, les escaliers et les cales existantes sont démolis. La ceinture d’élévation le long des bâtiments du côté nord de la rue sera laissée. Au niveau supérieur de la rue, il y aura un escalier de forme ondulé ressemblant à la rive de la rivière et des pentes pour les personnes handicapées situées...
  • curprev 08:3008:30, 2 December 2021DG Regio talk contribs 12,461 bytes +195 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 10:4910:49, 21 October 2020DG Regio talk contribs 12,705 bytes +164 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:4910:49, 21 October 2020DG Regio talk contribs 12,541 bytes −151 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:4910:49, 21 October 2020DG Regio talk contribs 12,692 bytes +1,850 Created claim: summary (P836): The project includes the reconstruction of Długa Street from the Market Square to the Duchess’ Square of Piastówny. It is assumed to demolish existing flowerbeds, staircases and slipways. There will be an elevation strip along the buildings on the north side of the street. The upper level of the street will be led by a waved staircase resembling the riverbank and slipways for people with disabilities located on both sides of the elevation. Woode...
  • curprev 10:4910:49, 21 October 2020DG Regio talk contribs 10,842 bytes −1,364 Removed claim: summary (P836): The project consists of the reconstruction of the DDebt street from the market to the Prince Piaszyn Square Square. The demolition of existing April, stairs and slipways is assumed. The increase will be left to the building on the northern side of the street. In the upper street, the street will be guided by stairs with an corrugated shape reminiscent of the bank of the river and ramps for persons with disabilities located on both sides of the...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 10:1510:15, 10 March 2020DG Regio talk contribs 10,916 bytes +1,364 Created claim: summary (P836): The project consists of the reconstruction of the DDebt street from the market to the Prince Piaszyn Square Square. The demolition of existing April, stairs and slipways is assumed. The increase will be left to the building on the northern side of the street. In the upper street, the street will be guided by stairs with an corrugated shape reminiscent of the bank of the river and ramps for persons with disabilities located on both sides of the i...

25 February 2020

18 February 2020

31 January 2020

14 January 2020