Revision history of "Centre for Community Services and Local Activity Market 22 in Czeladzi with land development" (Q126080)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2106:21, 9 October 2024DG Regio talk contribs 62,328 bytes +4 Changed label, description and/or aliases in pt
  • curprev 06:2106:21, 9 October 2024DG Regio talk contribs 62,324 bytes −151 Set a claim value: summary (P836): Em resultado da execução efetiva do projeto, o edifício em ul. O mercado 22 será adaptado de forma abrangente às necessidades do novo CUSiAL. Prevê: — demolição de edifícios agrícolas com o edifício da florista e vedação existente, — adaptação do edifício existente às instalações da CUSiAL e parte de restauração (parte de remodelação implementada como parte dos custos inelegíveis), — ampliação do edifício existente com uma nova parte adaptada às ins...

23 March 2024

15 January 2024

12 June 2023

24 May 2023

3 March 2023

  • curprev 00:1100:11, 3 March 2023DG Regio talk contribs 60,078 bytes +2,674 Changed label, description and/or aliases in lt, bg, cs, fi, es, sl, pt, nl, it, ga, hr, el, fr, lv, de, ro, mt, hu, sk, sv, et, da, and other parts

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 16:2816:28, 27 July 2022DG Regio talk contribs 55,281 bytes +33,137 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 08:2908:29, 2 December 2021DG Regio talk contribs 13,963 bytes +1,871 Created claim: summary (P836): Suite à la mise en œuvre matérielle du projet, le bâtiment à ul. Le marché 22 sera entièrement adapté pour le nouveau CUSiAL. Il est prévu: — la démolition de bâtiments agricoles avec le bâtiment fleuriste et la clôture existante, — l’adaptation du bâtiment existant aux locaux du CUSiAL et à la partie restauration (la partie restauration effectuée dans le cadre des coûts inéligibles), — l’extension du bâtiment existant avec une nouvelle partie a...
  • curprev 08:2908:29, 2 December 2021DG Regio talk contribs 12,092 bytes +180 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 10:3010:30, 21 October 2020DG Regio talk contribs 12,351 bytes +151 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:3010:30, 21 October 2020DG Regio talk contribs 12,200 bytes −141 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:3010:30, 21 October 2020DG Regio talk contribs 12,341 bytes +1,623 Created claim: summary (P836): As a result of the actual implementation of the project, the building at ul. Market 22 will be comprehensively adapted to the needs of the new CUSiAL. It provides for: — demolition of farm buildings with the florist’s building and existing fence, – adaptation of the existing building to CUSiAL premises and catering part (refreshment part implemented as part of the ineligible costs), – extension of the existing building with a new part adapted to...
  • curprev 10:3010:30, 21 October 2020DG Regio talk contribs 10,718 bytes −1,369 Removed claim: summary (P836): As a result of the actual implementation of the project, the building at ul. Market 22 will be comprehensively adapted to the needs of the new CUSiAL. Scheduled for: — The dismantling of economic buildings with the flower building and the existing fence, — adapting the existing building to the premises of CUSiAL and the part of the catering area (part of the catering area), — extension of the existing building to a new part adapted to the acco...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 12:4612:46, 10 March 2020DG Regio talk contribs 10,798 bytes +1,369 Created claim: summary (P836): As a result of the actual implementation of the project, the building at ul. Market 22 will be comprehensively adapted to the needs of the new CUSiAL. Scheduled for: — The dismantling of economic buildings with the flower building and the existing fence, — adapting the existing building to the premises of CUSiAL and the part of the catering area (part of the catering area), — extension of the existing building to a new part adapted to the accomm...

25 February 2020

18 February 2020

31 January 2020

14 January 2020