Revision history of "Adaptation of the building by the School Complex in Waleńczów to a -hour care and educational facility up to 14 children" (Q126052)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2106:21, 9 October 2024DG Regio talk contribs 56,108 bytes +9 Changed label, description and/or aliases in pt
  • curprev 06:2106:21, 9 October 2024DG Regio talk contribs 56,099 bytes −14 Set a claim value: summary (P836): Adaptação do edifício após o antigo complexo escolar na rua Waleńczów. Czestochowa 8 para criar uma instituição de cuidados e educação -hora com 14 assentos. O âmbito dos trabalhos de adaptação inclui a execução das obras de reparação necessárias (construção, elétrica e sanitária), relacionadas com a reconstrução e adaptação do sistema funcional existente do edifício a novas necessidades, a fim de cumprir as condições técnicas estabelecidas pelos re...

22 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:0920:09, 2 March 2023DG Regio talk contribs 53,716 bytes −118 Changed label, description and/or aliases in da, it, sk, pt, hr, ga, et, fi, lv, fr, lt, ro, sv, es, hu, mt, sl, bg, el, de, cs, nl, and other parts

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 16:2816:28, 27 July 2022DG Regio talk contribs 51,722 bytes +31,453 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 08:1708:17, 2 December 2021DG Regio talk contribs 13,401 bytes +1,620 Created claim: summary (P836): Adaptation du bâtiment après l’ancien complexe scolaire de Waleńczów à ul. Czestochowa 8 afin de créer un établissement d’enseignement et de soins infirmiers 24 heures sur 24 avec 14 places. Le champ d’application des travaux d’adaptation comprend l’exécution des travaux de rénovation nécessaires (construction, électrique et sanitaire) liés à la reconstruction et à l’adaptation de l’aménagement fonctionnel existant du bâtiment aux nouveaux besoi...
  • curprev 08:1708:17, 2 December 2021DG Regio talk contribs 11,781 bytes +238 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 10:2910:29, 21 October 2020DG Regio talk contribs 11,982 bytes +182 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:2910:29, 21 October 2020DG Regio talk contribs 11,800 bytes −160 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:2910:29, 21 October 2020DG Regio talk contribs 11,960 bytes +1,470 Created claim: summary (P836): Adaptation of the building after the former School Complex in Waleńczów Street. Czestochowa 8 to create a -hour care and educational institution with 14 seats. The scope of adaptation work includes the execution of the necessary repair works (construction, electrical and sanitary), related to the reconstruction and adaptation of the existing functional system of the building to new needs in order to meet the technical conditions laid down by the...
  • curprev 10:2910:29, 21 October 2020DG Regio talk contribs 10,490 bytes −1,001 Removed claim: summary (P836): Adaptation of the building to the former Zale Schools of the School at ul. Czestochowa 8 with a view to establishing a 24/7 care institution with 14 seats. The scope of the adaptation work includes the necessary renovation works (construction, electrical and sanitary), related to the construction and adaptation of the existing functional layout of the building, to meet the new needs in order to fulfil the technical conditions laid down in the...

25 September 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 12:4512:45, 10 March 2020DG Regio talk contribs 10,199 bytes +1,001 Created claim: summary (P836): Adaptation of the building to the former Zale Schools of the School at ul. Czestochowa 8 with a view to establishing a 24/7 care institution with 14 seats. The scope of the adaptation work includes the necessary renovation works (construction, electrical and sanitary), related to the construction and adaptation of the existing functional layout of the building, to meet the new needs in order to fulfil the technical conditions laid down in the ap...

25 February 2020

18 February 2020

31 January 2020

14 January 2020