Revision history of "Activity through integration" (Q125403)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

21 October 2022

27 July 2022

  • curprev 16:2116:21, 27 July 2022DG Regio talk contribs 58,825 bytes +36,000 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 08:3808:38, 2 December 2021DG Regio talk contribs 15,026 bytes +1,936 Created claim: summary (P836): Projet: L’«activité par l’intégration» cible un total de 20 personnes exposées au risque de pauvreté et d’exclusion sociale. L’objectif principal du projet mis en œuvre à Bielsko-Biała: L’«activité par l’intégration» est une augmentation du niveau d’activité socio-professionnelle de 20 habitants et résidents de la ville de Bielsko-Biała, dont 12 femmes et 8 hommes entre le 1er septembre 2019 et le 28 février 2021, sur la base d’un parcours indiv...
  • curprev 08:3808:38, 2 December 2021DG Regio talk contribs 13,090 bytes +89 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 12:0612:06, 21 October 2020DG Regio talk contribs 13,440 bytes +87 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:0612:06, 21 October 2020DG Regio talk contribs 13,353 bytes −82 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:0612:06, 21 October 2020DG Regio talk contribs 13,435 bytes +1,781 Created claim: summary (P836): Project titled: “Activities through integration” target a total of 20 people at risk of poverty and social exclusion. Main objective of the project carried out in Bielsko – Biała entitled: “Activity through integration” is an increase in the level of socio-occupational activity of 20 residents and residents of the city of Bielsko – Biała, including 12 women and 8 men between 01.09.2019 and 28.02.2021, based on an individual path of reintegration...
  • curprev 12:0612:06, 21 October 2020DG Regio talk contribs 11,654 bytes −1,301 Removed claim: summary (P836): The project, which is entitled “Active ownership” targets a total of up to 20 people at risk of poverty and social exclusion. The main objective of the project in Bielsko — White: “Active ownership” is an increase in the level of social activity of 20 inhabitants and residents of the city of Bielsko — Biała, including 12 women and 8 men in the period 01.09.2019-28.02.2021, on the basis of an individual reintegration pathway preceded by a diagn...

25 September 2020

24 September 2020

17 July 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 10:1310:13, 10 March 2020DG Regio talk contribs 11,234 bytes +1,301 Created claim: summary (P836): The project, which is entitled “Active ownership” targets a total of up to 20 people at risk of poverty and social exclusion. The main objective of the project in Bielsko — White: “Active ownership” is an increase in the level of social activity of 20 inhabitants and residents of the city of Bielsko — Biała, including 12 women and 8 men in the period 01.09.2019-28.02.2021, on the basis of an individual reintegration pathway preceded by a diagnos...

25 February 2020

18 February 2020

31 January 2020

14 January 2020