Revision history of "Complex design of model energy economy in conjunction with biomass production" (Q12539)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

22 December 2023

19 June 2023

11 June 2023

17 February 2023

27 July 2022

  • curprev 16:2016:20, 27 July 2022DG Regio talk contribs 37,397 bytes +17,295 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, lv, ga, sl, bg, mt, pt, da, ro, sv, cs, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, lv, ga, sl, bg, mt, pt, da, ro, sv,

15 January 2022

14 January 2022

12 December 2021

2 December 2021

  • curprev 08:0208:02, 2 December 2021DG Regio talk contribs 15,722 bytes +1,314 Created claim: summary (P836): Gegenstand des Angebots ist das Produkt in Form einer konzeptionellen Gestaltung des Energiesystems für das Portfolio des Unternehmens der Klägerin. Aus energiepolitischer Sicht bietet die Klägerin ein breites Spektrum an Anwendungsbereichen und die wichtigsten Optionen für die Straffung des Betriebs des gesamten Komplexes umfassen die Nutzung der verfügbaren energieverwendbaren Rohstoffe in den Räumlichkeiten des Unternehmens und die Nutzung ve...
  • curprev 08:0208:02, 2 December 2021DG Regio talk contribs 14,408 bytes +153 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 09:2209:22, 28 November 2021DG Regio talk contribs 14,255 bytes +1,348 Created claim: summary (P836): L’objet de l’offre est le produit sous la forme d’une conception conceptuelle du système énergétique pour le portefeuille de l’entreprise de la requérante. Du point de vue de l’énergie, la requérante offre un large éventail de possibilités et les principales options pour rationaliser l’exploitation de l’ensemble du complexe comprennent l’utilisation de matières premières utilisables en énergie dans les locaux de l’entreprise et l’utilisation des...
  • curprev 09:2209:22, 28 November 2021DG Regio talk contribs 12,907 bytes +166 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 15:3715:37, 22 October 2020DG Regio talk contribs 13,190 bytes +1,236 Created claim: summary (P836): The subject of the offer is the product in the form of a conceptual design of the energy system for the applicant’s portfolio. From an energy point of view, the applicant provides a wide range of scope and among the main possibilities to streamline the operation of the complex is the use of available energy-usable raw materials on the premises of the company and the use of available renewable energy sources. a., translated_summary
  • curprev 15:3715:37, 22 October 2020DG Regio talk contribs 11,954 bytes −755 Removed claim: summary (P836): The tender relates to a product in the form of a conceptual design of the energy system into the applicant’s portfolio. From the energy point of view, the applicant provides a wide scope and the main options for streamlining the operation of the whole complex are the use of available energy-efficient materials within the company and the use of available renewable energy sources., remove_old_english_translation
  • curprev 06:4106:41, 22 October 2020DG Regio talk contribs 12,709 bytes +136 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 06:4106:41, 22 October 2020DG Regio talk contribs 12,573 bytes −155 Changed label, description and/or aliases in 1 language: remove_english_label

15 July 2020

6 June 2020

25 March 2020

26 February 2020

  • curprev 07:5507:55, 26 February 2020DG Regio talk contribs 11,437 bytes +755 Created claim: summary (P836): The tender relates to a product in the form of a conceptual design of the energy system into the applicant’s portfolio. From the energy point of view, the applicant provides a wide scope and the main options for streamlining the operation of the whole complex are the use of available energy-efficient materials within the company and the use of available renewable energy sources., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020