Revision history of "“Strengthening socio-professional potential” for the period 2020-2021 stage II." (Q125210)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:2318:23, 9 October 2024DG Regio talk contribs 63,956 bytes +11 Changed label, description and/or aliases in pt
  • curprev 18:2318:23, 9 October 2024DG Regio talk contribs 63,945 bytes −12 Set a claim value: summary (P836): No período de 01.08.2020 a 31.07.2022, nos ambientes locais multiproblemas identificados na LPR de Zawiercie como exigindo revitalização, serão implementadas ações abrangentes para reforçar o sentido de identidade e coesão social dos residentes, incluindo o apoio às competências sociais, a favor do emprego e a educação. 56 pessoas (29K/27M). Serão apoiadas comunidades locais inteiras, tendo em conta as necessidades individuais dos seus membros inati...

22 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 18:4618:46, 2 March 2023DG Regio talk contribs 61,199 bytes +710 Changed label, description and/or aliases in da, sk, lv, it, et, fr, ga, ro, el, sv, bg, hu, de, es, cs, sl, mt, pt, lt, hr, nl, fi, and other parts

21 October 2022

2 July 2022

  • curprev 20:3720:37, 2 July 2022DG Regio talk contribs 59,672 bytes +36,774 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 08:2808:28, 2 December 2021DG Regio talk contribs 15,088 bytes +1,958 Created claim: summary (P836): Au cours de la période allant du 1er août 2020 au 31 juillet 2022, dans les environnements locaux à problèmes multiples identifiés dans le LPR de Zawiercie comme nécessitant une revitalisation, des actions globales seront mises en œuvre pour renforcer le sens de l’identité et de la cohésion sociale des résidents, y compris le soutien aux compétences sociales, à la lutte contre l’empoisonnement et à l’éducation. 56 personnes (29K/27M). Un soutien...
  • curprev 08:2808:28, 2 December 2021DG Regio talk contribs 13,130 bytes +132 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 11:1611:16, 21 October 2020DG Regio talk contribs 13,437 bytes +142 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:1611:16, 21 October 2020DG Regio talk contribs 13,295 bytes −139 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:1611:16, 21 October 2020DG Regio talk contribs 13,434 bytes +1,732 Created claim: summary (P836): In the period 01.08.2020 to 31.07.2022, in the multi-problem local environments identified in the LPR of Zawiercie as requiring revitalisation, comprehensive actions will be implemented to strengthen the sense of identity and social cohesion of residents, including support for social competences, pro-employment., education. 56 people (29K/27M). Whole local communities will be supported, taking into account the individual needs of their inactive...
  • curprev 11:1611:16, 21 October 2020DG Regio talk contribs 11,702 bytes −1,302 Removed claim: summary (P836): In the period 01.08.2020 to 31.07.2022, in multi-problem local communities identified in the LPR municipality as needing to be revitalised, comprehensive measures will be implemented to strengthen the sense of identity and social cohesion of the population, including support for social competences, poisoning. 56 persons (29K/27M). The support will be provided to all local communities, taking account of the individual needs of their economicall...

25 September 2020

24 September 2020

17 July 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 10:1610:16, 10 March 2020DG Regio talk contribs 11,281 bytes +1,302 Created claim: summary (P836): In the period 01.08.2020 to 31.07.2022, in multi-problem local communities identified in the LPR municipality as needing to be revitalised, comprehensive measures will be implemented to strengthen the sense of identity and social cohesion of the population, including support for social competences, poisoning. 56 persons (29K/27M). The support will be provided to all local communities, taking account of the individual needs of their economically...

25 February 2020

18 February 2020

31 January 2020

14 January 2020