Revision history of "Construction of the N-S Route in Ruda Śląskie connecting the Road Medium Route with the A4 motorway – stage II" (Q124482)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:0620:06, 2 March 2023DG Regio talk contribs 63,684 bytes −63 Changed label, description and/or aliases in it, sk, lv, da, fr, fi, cs, et, pt, ga, lt, bg, sl, ro, hr, hu, es, mt, sv, el, nl, de, and other parts

21 October 2022

2 July 2022

  • curprev 20:1820:18, 2 July 2022DG Regio talk contribs 62,932 bytes +38,853 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 08:3808:38, 2 December 2021DG Regio talk contribs 15,475 bytes +2,024 Created claim: summary (P836): L’objet du projet est la construction du dernier tronçon de la ligne N-S, qui vise à créer un lien de non-collision entre la route du diamètre de la route et l’autoroute A4. Cette section comprend la construction de la route N-S d’une longueur de 1 670 m d’ul. Kokota pour se connecter à l’autoroute A4 dans la jonction «Wirek». Le projet prévoit la construction, entre autres: — structures techniques — éléments du système de drainage — trottoirs e...
  • curprev 08:3808:38, 2 December 2021DG Regio talk contribs 13,451 bytes +165 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 10:1310:13, 21 October 2020DG Regio talk contribs 13,725 bytes +174 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:1310:13, 21 October 2020DG Regio talk contribs 13,551 bytes −181 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:1310:13, 21 October 2020DG Regio talk contribs 13,732 bytes +1,920 Created claim: summary (P836): The object of the project is the construction of the last section of the N-S route, which aims to establish an uncollid connection of the Road Medium Route with the A4 motorway. This section includes the construction of the N-S route 1670 m from the street. Kokota to connect to the A4 motorway in the “Wirek” junction. The project included the construction of: — engineering facilities – elements of the drainage system – pavements and cycle paths...
  • curprev 10:1310:13, 21 October 2020DG Regio talk contribs 11,812 bytes −1,457 Removed claim: summary (P836): The object of the project is the construction of the most recent section of the N-S route, which is aimed at creating a connecting distance between Road Routes and the A4 motorway. This section includes the construction of the N-S route with a length of 1 670 m from ul. Kotten to connect to the A4 motorway in the ‘Wirek’ node. The project provided for the construction, inter alia, of the following: — Engineering structures — elements of a syst...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

10 March 2020

  • curprev 12:2912:29, 10 March 2020DG Regio talk contribs 11,547 bytes +1,457 Created claim: summary (P836): The object of the project is the construction of the most recent section of the N-S route, which is aimed at creating a connecting distance between Road Routes and the A4 motorway. This section includes the construction of the N-S route with a length of 1 670 m from ul. Kotten to connect to the A4 motorway in the ‘Wirek’ node. The project provided for the construction, inter alia, of the following: — Engineering structures — elements of a system...

25 February 2020

18 February 2020

31 January 2020

14 January 2020