Revision history of "Construction of the N-S Route in Ruda Ślaska connecting the Road Diameter Route with the A4 Motorway – stage I" (Q124481)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:0620:06, 2 March 2023DG Regio talk contribs 64,022 bytes −269 Changed label, description and/or aliases in da, sk, et, ga, fi, it, hr, de, bg, es, sv, pt, cs, lv, nl, ro, fr, hu, lt, sl, el, mt, and other parts

21 October 2022

2 July 2022

  • curprev 20:1820:18, 2 July 2022DG Regio talk contribs 63,475 bytes +39,375 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 08:3808:38, 2 December 2021DG Regio talk contribs 15,511 bytes +2,038 Created claim: summary (P836): L’objet du projet est la construction de la route N-S à Ruda Śląskia, reliant la DTŚ à l’autoroute A4. Le projet est divisé en phase II, la présente proposition concerne la mise en œuvre de la phase I du projet. Le champ d’application de l’étape I est divisé en deux sections: — Section I — de l’ul. 1er mai à ul. Hêtre avec une jonction à deux niveaux et la construction d’un tronçon de la route à partir de ul. Hêtre à hêtre rue. FR Dimanche (Nowo...
  • curprev 08:3808:38, 2 December 2021DG Regio talk contribs 13,473 bytes +153 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 10:1310:13, 21 October 2020DG Regio talk contribs 13,759 bytes +173 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:1310:13, 21 October 2020DG Regio talk contribs 13,586 bytes −162 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:1310:13, 21 October 2020DG Regio talk contribs 13,748 bytes +1,970 Created claim: summary (P836): The subject of the project is the construction of the N-S Route in Ruda Śląskia, connecting the DTŚ with the A4 motorway. The project is divided into second phases and this proposal concerns the implementation of phase I of the project. The scope of Stage I shall be divided into 2 sections: — Episode I – from ul. 1 May to St. Bukowa together with a two-storey junction and construction of a section of the road from. ul. Bukowa to St. FR. Sunday (...
  • curprev 10:1310:13, 21 October 2020DG Regio talk contribs 11,778 bytes −1,405 Removed claim: summary (P836): The project involves the construction of a N-S Trasa in Ruda Śląska, connecting the DTS to the A4 motorway. The project is divided into Phase II, this proposal concerns the implementation of phase I of the project. The scope of Phase I is divided into 2 sections: — Section I — from ul. 1 May to ul. Bukova with a two-layer node and a section of the road. Bukowa to ul. Kp. Sunday II — from ul. Bukowa to ul. Kotten plus a two-mile node. In formal...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

10 March 2020

  • curprev 12:2912:29, 10 March 2020DG Regio talk contribs 11,462 bytes +1,405 Created claim: summary (P836): The project involves the construction of a N-S Trasa in Ruda Śląska, connecting the DTS to the A4 motorway. The project is divided into Phase II, this proposal concerns the implementation of phase I of the project. The scope of Phase I is divided into 2 sections: — Section I — from ul. 1 May to ul. Bukova with a two-layer node and a section of the road. Bukowa to ul. Kp. Sunday II — from ul. Bukowa to ul. Kotten plus a two-mile node. In formal a...

25 February 2020

18 February 2020

31 January 2020

14 January 2020