Revision history of "Development of municipal waste recovery and disposal facility in Racibórz" (Q124333)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:3718:37, 8 October 2024DG Regio talk contribs 66,359 bytes −4 Changed label, description and/or aliases in pt
  • curprev 18:3718:37, 8 October 2024DG Regio talk contribs 66,363 bytes −59 Set a claim value: summary (P836): O investimento inclui a expansão da atual estação de compostagem de resíduos verdes, da atual capacidade de 3 700 Mg/ano para uma capacidade de 4 000 Mg/ano. No âmbito do investimento, está prevista a alteração da localização das infraestruturas técnicas existentes, ou seja, um contentor social e de escritório, um armazém de equipamentos e caixas de compostagem prontas para aumentar a área da praça disponível onde se realiza a compostagem de resíduo...

22 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

25 October 2022

21 October 2022

2 July 2022

  • curprev 20:1420:14, 2 July 2022DG Regio talk contribs 60,476 bytes +37,028 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 08:3008:30, 2 December 2021DG Regio talk contribs 15,110 bytes +1,939 Created claim: summary (P836): L’investissement comprend l’extension de l’usine existante de compostage de déchets verts de la capacité actuelle de 3 700 Mg/an à une capacité de 4 000 Mg/an. Dans le cadre de l’investissement, il est prévu de modifier l’emplacement des infrastructures techniques existantes, c’est-à-dire un conteneur social, un hangar pour l’équipement et des boîtes à compost prêtes à être fabriquées afin d’augmenter la superficie disponible du site où le compo...
  • curprev 08:3008:30, 2 December 2021DG Regio talk contribs 13,171 bytes +168 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 09:5709:57, 21 October 2020DG Regio talk contribs 13,442 bytes +133 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 09:5709:57, 21 October 2020DG Regio talk contribs 13,309 bytes −149 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 09:5709:57, 21 October 2020DG Regio talk contribs 13,458 bytes +1,777 Created claim: summary (P836): The investment includes the expansion of the existing green waste composting plant from the current capacity of 3 700 Mg/year to a capacity of 4 000 Mg/year. As part of the investment, it is planned to change the location of existing technical infrastructure facilities, i.e. a social and office container, a warehouse for equipment and ready compost boxes to increase the area of the available square where the waste composting takes place. Due to...
  • curprev 09:5709:57, 21 October 2020DG Regio talk contribs 11,681 bytes −1,406 Removed claim: summary (P836): The investment includes the extension of the existing green waste composting plant from the current capacity of 3 700 Mg/year to a capacity of 4 000 Mg/year. As part of the investment, it is planned to change the location of the existing infrastructure of the technical infrastructure, i.e. the office of social and office buildings, the storage of equipment and boxing of finished compost, in order to increase the available area of the site on w...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

10 March 2020

  • curprev 10:2510:25, 10 March 2020DG Regio talk contribs 11,363 bytes +1,406 Created claim: summary (P836): The investment includes the extension of the existing green waste composting plant from the current capacity of 3 700 Mg/year to a capacity of 4 000 Mg/year. As part of the investment, it is planned to change the location of the existing infrastructure of the technical infrastructure, i.e. the office of social and office buildings, the storage of equipment and boxing of finished compost, in order to increase the available area of the site on whi...

24 February 2020

18 February 2020

31 January 2020

14 January 2020