Revision history of "Improvement of water and sewage management through the construction of sanitary sewage system in the city Przystajń Street. School and construction of water supply in Przystajń Street. Flower" (Q124221)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:0420:04, 2 March 2023DG Regio talk contribs 56,327 bytes −702 Changed label, description and/or aliases in da, it, sk, lv, hu, pt, ga, sv, et, hr, fi, ro, sl, cs, mt, de, lt, es, el, bg, fr, nl, and other parts

25 October 2022

21 October 2022

2 July 2022

  • curprev 20:1020:10, 2 July 2022DG Regio talk contribs 55,366 bytes +33,561 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 08:2308:23, 2 December 2021DG Regio talk contribs 14,609 bytes +1,672 Created claim: summary (P836): Le champ d’application de l’investissement comprend la construction de: • réseau d’assainissement en ul. À l’école, à la jetée. Le champ d’application du projet comprend les travaux de construction: réseau gravitationnel, système de décharge avec reconstruction de la station de pompage des eaux usées existante • réseau d’approvisionnement en eau en ul. Floralowa à Przystajnia sur la section de la propriété no 7 à l’intersection avec ul. Rail — r...
  • curprev 08:2308:23, 2 December 2021DG Regio talk contribs 12,937 bytes +294 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 12:2912:29, 21 October 2020DG Regio talk contribs 13,082 bytes +253 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:2912:29, 21 October 2020DG Regio talk contribs 12,829 bytes −209 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:2912:29, 21 October 2020DG Regio talk contribs 13,038 bytes +1,528 Created claim: summary (P836): The scope of the investment includes the construction of: • sanitary sewage networks in ul. High school, in the backyard. The scope of the project includes construction works: gravitational network, pressing with reconstruction of the existing sewage pumping plant • water supply network in ul. Flower in Przystajnia on the section from property no. 7 to the intersection with ul. Rail – which consists of replacing the existing well-maintained wate...
  • curprev 12:2912:29, 21 October 2020DG Regio talk contribs 11,510 bytes −1,023 Removed claim: summary (P836): The scope of the investment includes the building of: • a sewerage network in ul. In the field of schooling, in the following areas. The scope of the project covers works: gravity network, press and reconstruction of the existing sewage pumping station• the water supply network in the ul. The flower in the area from post 7 to the junction to the ul. Railway — replacing the existing water supply from steel pipes — the new water supply network f...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

10 March 2020

  • curprev 10:2110:21, 10 March 2020DG Regio talk contribs 10,811 bytes +1,023 Created claim: summary (P836): The scope of the investment includes the building of: • a sewerage network in ul. In the field of schooling, in the following areas. The scope of the project covers works: gravity network, press and reconstruction of the existing sewage pumping station• the water supply network in the ul. The flower in the area from post 7 to the junction to the ul. Railway — replacing the existing water supply from steel pipes — the new water supply network fro...

24 February 2020

18 February 2020

31 January 2020

14 January 2020