Revision history of "Protection of the drinking water reservoir Dziećkowice through the construction of sanitary sewage system for the City of Imielin – stage II (area 3 and area 4)" (Q124209)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 05:2605:26, 10 October 2024DG Regio talk contribs 66,108 bytes +7 Changed label, description and/or aliases in pt
  • curprev 05:2605:26, 10 October 2024DG Regio talk contribs 66,101 bytes −54 Set a claim value: summary (P836): O projecto tem por objecto a ampliação e modernização do sistema de recolha de águas residuais na comuna de Imielin. O projeto prevê a extensão do sistema de esgotos sanitários e a construção de uma estação de bombagem. Está prevista a construção de cerca de 40 km de esgotos sanitários e o seu transporte para 625 edifícios residenciais. Devido aos condicionalismos associados ao número de aglomerações resultantes do ACPOŚK, as ações elegíveis no âmbi...

7 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:0420:04, 2 March 2023DG Regio talk contribs 62,620 bytes +941 Changed label, description and/or aliases in da, it, sk, es, et, de, cs, lt, sv, ga, fi, bg, lv, ro, nl, pt, hr, fr, el, sl, hu, mt, and other parts

25 October 2022

21 October 2022

2 July 2022

  • curprev 20:1020:10, 2 July 2022DG Regio talk contribs 60,005 bytes +36,741 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 08:2208:22, 2 December 2021DG Regio talk contribs 15,243 bytes +1,900 Created claim: summary (P836): L’objet du projet est le développement et la modernisation complets du système de collecte des eaux usées dans la municipalité d’Imielin. Le projet prévoit le développement du système d’assainissement sanitaire et la construction d’une station de pompage. Il est prévu de construire environ. 40 km d’assainissement et l’amener à 625 bâtiments résidentiels. En raison des contraintes liées à l’agglomération résultant de l’ACPOŚK, les actions éligibl...
  • curprev 08:2208:22, 2 December 2021DG Regio talk contribs 13,343 bytes +236 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 12:2912:29, 21 October 2020DG Regio talk contribs 13,546 bytes +223 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:2912:29, 21 October 2020DG Regio talk contribs 13,323 bytes −189 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:2912:29, 21 October 2020DG Regio talk contribs 13,512 bytes +1,779 Created claim: summary (P836): The subject of the project is a comprehensive extension and modernisation of the sewage collection system in the Imielin commune. The project envisages the extension of the sanitary sewer system and the construction of a pumping plant. It is planned to build approx. 40 km of sanitary sewerage and bringing it to 625 residential buildings. Due to the constraints associated with the number of Agglomerations resulting from the ACPOŚK, eligible actio...
  • curprev 12:2912:29, 21 October 2020DG Regio talk contribs 11,733 bytes −1,342 Removed claim: summary (P836): The project consists of a comprehensive extension and modernisation of the wastewater collection system in the municipality of Imielin. The project provides for the development of the sewage system and the construction of the pumping station. It is planned to build around 40 km of sanitary sewage system and 625 km of housing. Due to the constraints associated with the agglomeration of Aglomeracja, the actions eligible for the project relate to...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

10 March 2020

  • curprev 10:2110:21, 10 March 2020DG Regio talk contribs 11,355 bytes +1,342 Created claim: summary (P836): The project consists of a comprehensive extension and modernisation of the wastewater collection system in the municipality of Imielin. The project provides for the development of the sewage system and the construction of the pumping station. It is planned to build around 40 km of sanitary sewage system and 625 km of housing. Due to the constraints associated with the agglomeration of Aglomeracja, the actions eligible for the project relate to t...

24 February 2020

18 February 2020

31 January 2020

14 January 2020