Revision history of "Construction of the "Bike&Ride" car park together with the construction of bicycle roads as access roads to the planned parking lot in Mysłowice" (Q124110)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:2416:24, 10 October 2024DG Regio talk contribs 65,449 bytes +1 Changed label, description and/or aliases in pt
  • curprev 16:2416:24, 10 October 2024DG Regio talk contribs 65,448 bytes +26 Set a claim value: summary (P836): O âmbito do investimento inclui a construção do parque de estacionamento principal «Bike&Ride», juntamente com a construção de estradas para bicicletas como vias de acesso ao parque de estacionamento previsto. Um total de 7498 metros de linhas de bicicletas a pé serão criados como parte do projecto. Será criado um «Bikeamp;Ride» na área da passagem subterrânea entre a rua. Oswiecimska e ul. Insurrectos e lugares de estacionamento para bicicletas (ul...

7 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:0420:04, 2 March 2023DG Regio talk contribs 63,389 bytes +304 Changed label, description and/or aliases in da, it, sk, el, fi, lv, fr, pt, hr, sl, et, es, sv, ga, lt, ro, mt, de, hu, nl, bg, cs, and other parts

21 October 2022

27 July 2022

  • curprev 16:0316:03, 27 July 2022DG Regio talk contribs 62,272 bytes +38,355 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 08:1708:17, 2 December 2021DG Regio talk contribs 15,427 bytes +1,977 Created claim: summary (P836): Le champ d’application de l’investissement comprend la construction du parking principal «Bike &Ride» ainsi que la construction de routes cyclables comme routes d’accès au parking prévu. Au total, 7498 mb de trains à vélos à pied seront créés dans le cadre du projet. «Bike &Ride» sera créé dans la zone du passage souterrain entre ul. Oświęcimska, et st. Insurgés et places de parking pour vélos (ul. L’armée nationale, rue Słupecka, ville cyclable...
  • curprev 08:1708:17, 2 December 2021DG Regio talk contribs 13,450 bytes +189 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 11:3911:39, 21 October 2020DG Regio talk contribs 13,700 bytes +205 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:3911:39, 21 October 2020DG Regio talk contribs 13,495 bytes −205 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:3911:39, 21 October 2020DG Regio talk contribs 13,700 bytes +1,863 Created claim: summary (P836): The scope of the investment includes the construction of the main car park "Bike&Ride" together with the construction of bicycle roads as access roads to the planned parking lot. A total of 7498 metres of walking-bike lines will be created as part of the project. A “Bikeamp;Ride” will be created in the area of the underground passage between the street. Oswiecimska, and ul. Insurgents and parking spaces for bicycles (ul. The National Army, Słupe...
  • curprev 11:3911:39, 21 October 2020DG Regio talk contribs 11,837 bytes −1,433 Removed claim: summary (P836): The scope of the investment includes the construction of a main car park “Bike & Ride” together with the construction of a bicycle road as access roads to the planned parking area. A total of 7498 mb pedestrian/cycle paths will be created as part of the project. A “Bike & Ride” will be created in the area of the underground passage between ul. Oświęciemska and ul. Powstańców and the parking places for bicycles (ul. The National Army, ul.Słupec...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

10 March 2020

  • curprev 10:1310:13, 10 March 2020DG Regio talk contribs 11,548 bytes +1,433 Created claim: summary (P836): The scope of the investment includes the construction of a main car park “Bike & Ride” together with the construction of a bicycle road as access roads to the planned parking area. A total of 7498 mb pedestrian/cycle paths will be created as part of the project. A “Bike & Ride” will be created in the area of the underground passage between ul. Oświęciemska and ul. Powstańców and the parking places for bicycles (ul. The National Army, ul.Słupecka...

25 February 2020

18 February 2020

31 January 2020

14 January 2020