Revision history of "Improving energy efficiency combined with an increase in the share of renewable energy in the City of Racibórz – stage II" (Q123976)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 05:2605:26, 10 October 2024DG Regio talk contribs 57,462 bytes −21 Changed label, description and/or aliases in pt
  • curprev 05:2605:26, 10 October 2024DG Regio talk contribs 57,483 bytes +3 Set a claim value: summary (P836): O projeto prevê a construção da instalação de painéis fotovoltaicos, a substituição da iluminação por iluminação LED, a modernização térmica do telhado e a reconstrução do sistema de ventilação e ar condicionado, no edifício da Câmara Municipal de Racibórz, em ul. Król Stefan Batory 6 em Raciborz. Módulos fotovoltaicos com uma capacidade total de 40 kWp e uma quantidade de 160 unidades serão instalados na área do telhado da Câmara Municipal de Racib...

12 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 22:4722:47, 2 March 2023DG Regio talk contribs 53,945 bytes +618 Changed label, description and/or aliases in da, sk, it, ga, et, sl, fr, lv, bg, es, pt, fi, cs, de, el, ro, hu, sv, nl, mt, hr, lt, and other parts

25 October 2022

20 October 2022

2 July 2022

  • curprev 20:0320:03, 2 July 2022DG Regio talk contribs 51,666 bytes +30,708 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 08:1108:11, 2 December 2021DG Regio talk contribs 14,215 bytes +1,534 Created claim: summary (P836): Le projet prévoit la construction de panneaux photovoltaïques, le remplacement de l’éclairage pour l’éclairage mené, la modernisation thermique du toit et la reconstruction du système de ventilation et de climatisation, dans le bâtiment de l’hôtel de ville de Racibórz au 6 rue Króla Stefana Batory à Raciborz. Des modules photovoltaïques d’une capacité totale de 40 kWp et 160 unités seront installés sur le toit du bâtiment de l’hôtel de ville de...
  • curprev 08:1108:11, 2 December 2021DG Regio talk contribs 12,681 bytes +201 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 11:1211:12, 21 October 2020DG Regio talk contribs 12,919 bytes +184 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:1211:12, 21 October 2020DG Regio talk contribs 12,735 bytes −202 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:1211:12, 21 October 2020DG Regio talk contribs 12,937 bytes +1,494 Created claim: summary (P836): The project provides for the construction of the installation of photovoltaic panels, replacement of lighting for led lighting, thermal modernisation of the roof and reconstruction of the ventilation and air conditioning system, in the building of the Racibórz City Office at ul. Król Stefan Batory 6 in Raciborz. Photovoltaic modules with a total capacity of 40 kWp and a quantity of 160 units will be installed in the roof area of the Racibórz Cit...
  • curprev 11:1211:12, 21 October 2020DG Regio talk contribs 11,443 bytes −1,050 Removed claim: summary (P836): The project envisages the construction of the installation of photovoltaic panels, the exchange of lighting for leva lighting, the thermal renovation of the roof and the reconstruction of the ventilation and air conditioning system, in the building of the Racibórz City Hall office at the King Stefan Batore 6 in Racisborz. The solar modules with a combined output of 40 kWp and a quantity of 160 units will be installed in the rooftop of the Raci...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

10 March 2020

  • curprev 10:0610:06, 10 March 2020DG Regio talk contribs 10,771 bytes +1,050 Created claim: summary (P836): The project envisages the construction of the installation of photovoltaic panels, the exchange of lighting for leva lighting, the thermal renovation of the roof and the reconstruction of the ventilation and air conditioning system, in the building of the Racibórz City Hall office at the King Stefan Batore 6 in Racisborz. The solar modules with a combined output of 40 kWp and a quantity of 160 units will be installed in the rooftop of the Racibó...

25 February 2020

18 February 2020

31 January 2020

14 January 2020