Revision history of "Thermomodernisation of the School – Preschool Complex in Zabłocie" (Q123969)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:2006:20, 9 October 2024DG Regio talk contribs 64,458 bytes +2 Changed label, description and/or aliases in pt
  • curprev 06:2006:20, 9 October 2024DG Regio talk contribs 64,456 bytes −57 Set a claim value: summary (P836): O projeto tem por objeto a modernização térmica do edifício do Complexo Escolar e Pré-Escolar na rua Bielska, n.o 36, em Zabłocie. O âmbito das obras de adaptação térmica é o seguinte: — aquecimento de telhados, tetos e estropodache, — aquecimento de paredes externas, — substituição do processamento de chapas metálicas, — substituição do sistema de raios, — reconstrução do sistema de CO, — reconstrução do sistema da sala de caldeiras com a instalaçã...

7 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:0420:04, 2 March 2023DG Regio talk contribs 60,979 bytes +734 Changed label, description and/or aliases in lv, it, sk, da, fi, sv, fr, bg, et, el, pt, ro, ga, sl, cs, hu, es, mt, hr, nl, de, lt, and other parts

25 October 2022

20 October 2022

2 July 2022

  • curprev 20:0220:02, 2 July 2022DG Regio talk contribs 58,581 bytes +35,215 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 08:1108:11, 2 December 2021DG Regio talk contribs 15,127 bytes +2,005 Created claim: summary (P836): L’objet du projet est la thermomodernisation de la construction du complexe scolaire et préscolaire au 36, rue Bielska à Zabłocie. La portée des travaux de thermomodernisation est la suivante: — l’isolation des toitures, des plafonds et des sols, — l’isolation des murs extérieurs, — le remplacement des traitements en tôle, — le remplacement du système de foudre, — la reconstruction de l’installation C.O., — la reconstruction du système de chauff...
  • curprev 08:1108:11, 2 December 2021DG Regio talk contribs 13,122 bytes +131 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 11:1211:12, 21 October 2020DG Regio talk contribs 13,430 bytes +127 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:1211:12, 21 October 2020DG Regio talk contribs 13,303 bytes −117 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:1211:12, 21 October 2020DG Regio talk contribs 13,420 bytes +1,761 Created claim: summary (P836): The subject of the project is the thermal modernisation of the School and Preschool Complex building at 36 Bielska Street in Zabłocie. The scope of thermal retrofitting works is as follows: — warming of roofs, ceilings and stropodache, – warming of external walls, – replacement of sheet metal processing, – replacement of lightning system, – reconstruction of the C.O. system, – reconstruction of the boiler room system with the installation of hea...
  • curprev 11:1211:12, 21 October 2020DG Regio talk contribs 11,659 bytes −1,337 Removed claim: summary (P836): The purpose of the project is the thermal renovation of the school’s building, the pre-school centre at the Bielsko 36 street in Zabłocie. The scope of the thermomodernisation work is as follows: — insulation of roofs, costumes and costumes, — insulation of external walls, — replacement of blachard, — replacement of a lightning strike, modification of the installation of CO., — rebuilding of the boiler system with the installation of heat pump...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

10 March 2020

  • curprev 10:0610:06, 10 March 2020DG Regio talk contribs 11,276 bytes +1,337 Created claim: summary (P836): The purpose of the project is the thermal renovation of the school’s building, the pre-school centre at the Bielsko 36 street in Zabłocie. The scope of the thermomodernisation work is as follows: — insulation of roofs, costumes and costumes, — insulation of external walls, — replacement of blachard, — replacement of a lightning strike, modification of the installation of CO., — rebuilding of the boiler system with the installation of heat pumps...

25 February 2020

18 February 2020

31 January 2020

14 January 2020