Revision history of "Comprehensive liquidation of low emissions in public buildings of the Ogrodzieniec Municipality" (Q123874)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:2416:24, 10 October 2024DG Regio talk contribs 63,938 bytes +2 Changed label, description and/or aliases in pt
  • curprev 16:2416:24, 10 October 2024DG Regio talk contribs 63,936 bytes −231 Set a claim value: summary (P836): O âmbito do projeto inclui a modernização térmica abrangente de 4 edifícios públicos no município de Ogrodzieniec. O projeto prevê as seguintes obras (total para todos os edifícios): — aquecer as paredes exteriores. — isolamento de paredes de fundação e de pedestal até 100 cm abaixo do nível do solo — realização de novos rebocos na camada de isolamento — realização de isolamento anti-água de paredes subterrâneas e de pavimentos de fundação — realiza...

22 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:0919:09, 2 March 2023DG Regio talk contribs 60,632 bytes +4,677 Changed label, description and/or aliases in hr, cs, da, et, lt, el, nl, sl, fi, ga, pt, sk, ro, de, sv, it, bg, hu, mt, es, lv, and other parts

25 October 2022

22 October 2022

2 July 2022

  • curprev 19:5919:59, 2 July 2022DG Regio talk contribs 54,288 bytes +31,860 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 08:0508:05, 2 December 2021DG Regio talk contribs 14,782 bytes +1,797 Created claim: summary (P836): Le projet comprend une thermomodernisation complète de 4 bâtiments publics dans la municipalité d’Ogrodzieniec. Le projet prévoit les travaux suivants (totalement pour tous les bâtiments): — isolation des murs extérieurs. — isolation des murs de fondation et des murs de plinthe jusqu’à 100 cm sous le niveau du sol — faire de nouveaux plâtres sur la couche d’isolation thermique — exécution de l’étanchéité des murs des sols souterrains et des fond...
  • curprev 08:0508:05, 2 December 2021DG Regio talk contribs 12,985 bytes +170 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 11:0511:05, 21 October 2020DG Regio talk contribs 13,254 bytes +154 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:0511:05, 21 October 2020DG Regio talk contribs 13,100 bytes −157 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:0511:05, 21 October 2020DG Regio talk contribs 13,257 bytes +1,531 Created claim: summary (P836): The scope of the project includes comprehensive thermal modernisation of 4 public buildings in the Ogrodzieniec Municipality. The project foresees the following works (total for all buildings): — warming the outer walls. — insulation of foundation walls and pedestal walls up to 100 cm below ground level – making new plasters on the insulation layer – making antiwater insulation of underground and foundation floors walls – making insulation, anti...
  • curprev 11:0511:05, 21 October 2020DG Regio talk contribs 11,726 bytes −2,220 Removed claim: summary (P836): The scope of the project includes a comprehensive thermal modernisation of the 4 public buildings in the municipality of Ogrodziejiec. The project foresees the following works (all buildings in total): — insulation of internal walls. — insulation of foundation walls and rock walls up to 100 cm below ground — the execution of new plasters in the thermal insulation layer of the wall, insulation of walls of ground floor and fundamental wall insul...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

10 March 2020

  • curprev 10:0710:07, 10 March 2020DG Regio talk contribs 12,224 bytes +2,220 Created claim: summary (P836): The scope of the project includes a comprehensive thermal modernisation of the 4 public buildings in the municipality of Ogrodziejiec. The project foresees the following works (all buildings in total): — insulation of internal walls. — insulation of foundation walls and rock walls up to 100 cm below ground — the execution of new plasters in the thermal insulation layer of the wall, insulation of walls of ground floor and fundamental wall insulat...

25 February 2020

18 February 2020

31 January 2020

14 January 2020