Revision history of "Supporting energy efficiency in the Siewierz Municipality through energy modernisation of the buildings of the Primary School in Brudzowice" (Q123850)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:3718:37, 8 October 2024DG Regio talk contribs 65,468 bytes 0 Changed label, description and/or aliases in pt
  • curprev 18:3718:37, 8 October 2024DG Regio talk contribs 65,468 bytes +24 Set a claim value: summary (P836): O projeto tem por objeto a realização de obras de modernização térmica juntamente com a modernização do sistema de aquecimento central em dois edifícios públicos pertencentes ao município de Siewierz: 1. Escolas primárias em Brudzowice, com sede em ul. Escola 41 em Brudzowice 2. Escola primária em Brudzowice, com base nas raparigas número 52. O âmbito pormenorizado dos trabalhos abrange ambos os edifícios: modernização do sistema C.O. aquecimento do...

23 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:0320:03, 2 March 2023DG Regio talk contribs 61,909 bytes −122 Changed label, description and/or aliases in lv, da, it, sk, bg, hu, fr, pt, cs, fi, ro, el, ga, mt, et, es, de, lt, hr, sv, nl, and other parts

25 October 2022

22 October 2022

27 July 2022

  • curprev 16:0016:00, 27 July 2022DG Regio talk contribs 60,357 bytes +36,901 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 08:0508:05, 2 December 2021DG Regio talk contribs 15,282 bytes +1,903 Created claim: summary (P836): L’objet du projet est de réaliser des travaux de thermomodernisation ainsi que la modernisation des installations de chauffage central dans deux bâtiments publics appartenant à la commune de Siewierz: 1. École primaire de Brudzowice, dont le siège social est situé à ul. École 41 à Brudzowice 2. École primaire à Brudzowice, basée sur les filles numéro 52. L’étendue détaillée des travaux couvre les deux bâtiments: modernisation de l’installation C...
  • curprev 08:0508:05, 2 December 2021DG Regio talk contribs 13,379 bytes +223 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 11:0511:05, 21 October 2020DG Regio talk contribs 13,595 bytes +199 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 11:0511:05, 21 October 2020DG Regio talk contribs 13,396 bytes −180 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 11:0511:05, 21 October 2020DG Regio talk contribs 13,576 bytes +1,789 Created claim: summary (P836): The subject of the project is to perform thermal modernisation works together with modernisation of the central heating system in two public buildings belonging to the Municipality of Siewierz: 1. Primary Schools in Brudzowice, based at ul. School 41 in Brudzowice 2. Primary school in Brudzowice, based in girls number 52. The detailed scope of work covers both buildings: modernisation of the C.O. system roof/stropod warming, external wall warmin...
  • curprev 11:0511:05, 21 October 2020DG Regio talk contribs 11,787 bytes −1,365 Removed claim: summary (P836): The purpose of the project is to implement the thermal modernisation works together with the modernisation of the central heating system in two public buildings belonging to the Municipality of Siewierze: 1.Primary school in Brudzowice, located at ul. 41 in Brudzowice 2.Primary school in Brudzowice, with its registered office at 52. The detailed scope of work is to be found in both buildings: modernisation of the installation of C.O. insulatio...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

10 March 2020

  • curprev 10:0010:00, 10 March 2020DG Regio talk contribs 11,446 bytes +1,365 Created claim: summary (P836): The purpose of the project is to implement the thermal modernisation works together with the modernisation of the central heating system in two public buildings belonging to the Municipality of Siewierze: 1.Primary school in Brudzowice, located at ul. 41 in Brudzowice 2.Primary school in Brudzowice, with its registered office at 52. The detailed scope of work is to be found in both buildings: modernisation of the installation of C.O. insulation...

25 February 2020

18 February 2020

31 January 2020

14 January 2020