Revision history of "Energy modernisation of public utility buildings in the municipality of Bieruń – Primary School No. 1 and Gama Culture House" (Q123832)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 16:2416:24, 10 October 2024DG Regio talk contribs 56,424 bytes +14 Changed label, description and/or aliases in pt
  • curprev 16:2416:24, 10 October 2024DG Regio talk contribs 56,410 bytes −17 Set a claim value: summary (P836): O objeto do projeto é uma modernização térmica abrangente dos edifícios públicos no município de Bieruń. O projeto abrangerá dois edifícios: • Casa da Cultura “GAMA” em Bieruń, na área do isolamento do edifício, modernização da instalação de CO e modernização da ventilação do edifício (instalação mecânica e ar condicionado) e fornecimento de energia ao equipamento de ventilação. • Escola primária n.o 1 em Bieruń, na área do isolamento do edifício, i...

20 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 23:3723:37, 2 March 2023DG Regio talk contribs 52,892 bytes +1,069 Changed label, description and/or aliases in it, da, sk, fi, el, ro, de, cs, bg, lt, sl, lv, sv, ga, fr, es, pt, et, mt, hr, hu, nl, and other parts

25 October 2022

22 October 2022

2 July 2022

  • curprev 19:5819:58, 2 July 2022DG Regio talk contribs 50,150 bytes +29,337 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 08:0608:06, 2 December 2021DG Regio talk contribs 14,181 bytes +1,564 Created claim: summary (P836): L’objet du projet est la thermomodernisation complète des bâtiments publics dans la municipalité de Bieruń. Le projet couvrira deux bâtiments: • Maison de culture «Gama» à Bieruń dans le domaine du réchauffement des bâtiments, de la modernisation de l’installation de CO et de la modernisation de la ventilation du bâtiment (installation mécanique et climatisation) et de l’alimentation en énergie des équipements de ventilation. • École primaire no...
  • curprev 08:0608:06, 2 December 2021DG Regio talk contribs 12,617 bytes +201 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 07:2507:25, 21 October 2020DG Regio talk contribs 12,855 bytes +187 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 07:2507:25, 21 October 2020DG Regio talk contribs 12,668 bytes −175 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 07:2507:25, 21 October 2020DG Regio talk contribs 12,843 bytes +1,468 Created claim: summary (P836): The subject of the project is a comprehensive thermal modernisation of public buildings in the Bieruń Municipality. The project will cover two buildings: • Culture House “GAMA” in Bieruń in the area of insulation of the building, modernisation of the CO installation and modernisation of the ventilation of the building (mechanical installation and air conditioning) and power supply of ventilation equipment. • Elementary school no. 1 in Bieruń in...
  • curprev 07:2507:25, 21 October 2020DG Regio talk contribs 11,375 bytes −1,011 Removed claim: summary (P836): The project consists of a comprehensive thermal renovation of public buildings in the Municipality of Bieruń. The project will comprise two buildings: • House of culture in Bieruń in the field of insulation of the building, modernisation of CO systems and modernisation of the ventilation of the building (mechanical installation and air conditioning) and feeding of ventilation units. • Primary school No 1 in the construction of insulation of th...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

10 March 2020

  • curprev 10:0010:00, 10 March 2020DG Regio talk contribs 10,670 bytes +1,011 Created claim: summary (P836): The project consists of a comprehensive thermal renovation of public buildings in the Municipality of Bieruń. The project will comprise two buildings: • House of culture in Bieruń in the field of insulation of the building, modernisation of CO systems and modernisation of the ventilation of the building (mechanical installation and air conditioning) and feeding of ventilation units. • Primary school No 1 in the construction of insulation of the...

25 February 2020

18 February 2020

31 January 2020

14 January 2020