Revision history of "Thermal modernisation of public buildings in Zbrosławice commune – stage I" (Q123797)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:2318:23, 9 October 2024DG Regio talk contribs 59,146 bytes +7 Changed label, description and/or aliases in pt
  • curprev 18:2318:23, 9 October 2024DG Regio talk contribs 59,139 bytes −23 Set a claim value: summary (P836): O tema do projeto é uma modernização térmica abrangente de 3 edifícios públicos. No edifício do Gabinete Municipal em ul. As paredes, fundações, tetos e telhados serão isolados em 2 em Zbrosławice e o sistema de aquecimento central será modernizado; no edifício do ginásio do Complexo Escolar e Pré-Escolar da ul. Os 26 principais da Miedary serão isolados com paredes, fundações, telhado e estrópodes, a carpintaria de janelas e portas será substituída...

7 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:0320:03, 2 March 2023DG Regio talk contribs 55,627 bytes −119 Changed label, description and/or aliases in lv, sk, da, sv, fi, fr, bg, el, pt, et, ro, ga, sl, cs, hu, es, mt, hr, lt, de, and other parts

3 November 2022

25 October 2022

22 October 2022

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 08:0408:04, 2 December 2021DG Regio talk contribs 14,520 bytes +1,692 Created claim: summary (P836): L’objet du projet est la thermomodernisation complète de 3 bâtiments publics. Dans le bâtiment du bureau municipal à ul. Oświęcimska 2 à Zbrosławice sera des murs isolés, des fondations, des plafonds et des toits, et le chauffage central sera modernisé; dans le bâtiment du gymnase de l’école et du complexe préscolaire à ul. Le principal 26 de Miedary sera isolé avec des murs, des fondations, des toits et des planchers, des menuiseries de fenêtre...
  • curprev 08:0408:04, 2 December 2021DG Regio talk contribs 12,828 bytes +152 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 07:2407:24, 21 October 2020DG Regio talk contribs 13,115 bytes +136 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 07:2407:24, 21 October 2020DG Regio talk contribs 12,979 bytes −135 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 07:2407:24, 21 October 2020DG Regio talk contribs 13,114 bytes +1,619 Created claim: summary (P836): The subject of the project is a comprehensive thermal modernisation of 3 public buildings. In the building of the Municipal Office on ul. The walls, foundations, ceilings and roofs will be insulated in 2 in Zbrosławice and the central heating system will be modernised; in the building of the gymnasium at the School and Preschool Complex at ul. The main 26 in Miedary will be insulated with walls, foundations, roof and stropods, window and door ca...
  • curprev 07:2407:24, 21 October 2020DG Regio talk contribs 11,495 bytes −1,124 Removed claim: summary (P836): The project consists of a comprehensive thermal renovation of 3 public buildings. In the building of the Office of the Municipality at ul. The Oświęcimska 2 will look at walls, foundations, costumes and roofs and have upgraded central heating; in the gym attached to the School and School Team at ul. Main 26 in Mielec, the walls, foundations, roof and ceilings will be tested, the window and door joinery will be replaced and the lighting fitting...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

10 March 2020

  • curprev 09:5909:59, 10 March 2020DG Regio talk contribs 10,897 bytes +1,124 Created claim: summary (P836): The project consists of a comprehensive thermal renovation of 3 public buildings. In the building of the Office of the Municipality at ul. The Oświęcimska 2 will look at walls, foundations, costumes and roofs and have upgraded central heating; in the gym attached to the School and School Team at ul. Main 26 in Mielec, the walls, foundations, roof and ceilings will be tested, the window and door joinery will be replaced and the lighting fittings...

25 February 2020

18 February 2020

31 January 2020

14 January 2020