Revision history of "Photovoltaics – a source of renewable energy on four public buildings in Godów Commune" (Q123765)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:0604:06, 11 October 2024DG Regio talk contribs 66,505 bytes +9 Changed label, description and/or aliases in pt
  • curprev 04:0604:06, 11 October 2024DG Regio talk contribs 66,496 bytes −18 Set a claim value: summary (P836): O projeto envolve a construção de instalações FER – instalações fotovoltaicas em 4 edifícios de utilidade pública no município de Godów: —OK em Gołkowice — 114 painéis de 350 W — potência de instalação 39,9 kW — SP em Gołkowice — 114 painéis de 350 W — potência de instalação 39,9 kW — SP em Skrzyszów — 114 painéis de 350 W — potência de instalação 39,9 kW1 — Escola e pré-escola em Godów — 69 painéis de 350 W — potência de instalação 24,15 kW — insta...

12 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:0320:03, 2 March 2023DG Regio talk contribs 62,979 bytes −308 Changed label, description and/or aliases in da, it, sk, el, sv, bg, hu, fr, de, fi, lv, ro, ga, cs, et, pt, lt, sl, nl, es, mt, hr, and other parts

25 October 2022

22 October 2022

2 July 2022

  • curprev 19:5619:56, 2 July 2022DG Regio talk contribs 61,611 bytes +38,058 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 07:5807:58, 2 December 2021DG Regio talk contribs 15,280 bytes +1,953 Created claim: summary (P836): Le projet comprend la construction d’installations SER — installations photovoltaïques sur 4 bâtiments publics dans la municipalité de Godów: —OK à Gołkowice — 114 panneaux chacun 350 W — puissance d’installation 39,9 kW — SP à Gołkowice — 114 panneaux de 350 W — puissance d’installation 39,9 kW — SP à Skrzyszów — 114 panneaux chacun 350 W — puissance d’installation 39,9 kW1 — Équipe scolaire et préscolaire à Godów — 69 panneaux de 350 W — puiss...
  • curprev 07:5807:58, 2 December 2021DG Regio talk contribs 13,327 bytes +176 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 07:2307:23, 21 October 2020DG Regio talk contribs 13,590 bytes +148 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 07:2307:23, 21 October 2020DG Regio talk contribs 13,442 bytes −160 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 07:2307:23, 21 October 2020DG Regio talk contribs 13,602 bytes +1,841 Created claim: summary (P836): The project involves the construction of RES installations – photovoltaic installations on 4 public utility buildings in Godów Municipality: —OK in Gołkowice – 114 panels of 350 W – installation power 39.9 kW -SP in Gołkowice – 114 panels of 350 W – installation power 39.9 kW -SP in Skrzyszów – 114 panels of 350 W – installation power 39.9 kW1 – School and preschool in Godów – 69 panels of 350 W – installation power 24.15 kW Scope of works on bu...
  • curprev 07:2307:23, 21 October 2020DG Regio talk contribs 11,761 bytes −1,538 Removed claim: summary (P836): The project involves the construction of a renewable installation — a photovoltaic installation for 4 buildings of public interest in the Municipality of Godów: — OK in Gołkowicki — 114 panels of 350W, — power output of 39.9 kW — SP in Gołkowicki — 114 panels of 350 panels of 350 W — installation capacity of 39.9 kW — SP in Skrzyszów — 114 panels of panels of 350 W — capacity of 39,9 kW1 — School and School Group in Godów — 69 panels of W — Po...

17 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

10 March 2020

  • curprev 09:5909:59, 10 March 2020DG Regio talk contribs 11,569 bytes +1,538 Created claim: summary (P836): The project involves the construction of a renewable installation — a photovoltaic installation for 4 buildings of public interest in the Municipality of Godów: — OK in Gołkowicki — 114 panels of 350W, — power output of 39.9 kW — SP in Gołkowicki — 114 panels of 350 panels of 350 W — installation capacity of 39.9 kW — SP in Skrzyszów — 114 panels of panels of 350 W — capacity of 39,9 kW1 — School and School Group in Godów — 69 panels of W — Powe...

25 February 2020

18 February 2020

31 January 2020

14 January 2020