Revision history of "Construction of micro-installations of renewable energy sources for residents of the Koziegłowy commune and the City of Koziegłowy" (Q123758)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:2318:23, 9 October 2024DG Regio talk contribs 54,395 bytes +22 Changed label, description and/or aliases in pt
  • curprev 18:2318:23, 9 October 2024DG Regio talk contribs 54,373 bytes +35 Set a claim value: summary (P836): Âmbito do projeto executado na fórmula: o projeto e a construção incluem: 1. Preparação do projeto de documentação necessário: para a instalação de 71 kpl. de instalações fotovoltaicas de produção de eletricidade; 2. Execução de obras de construção e instalação de acordo com projetos desenvolvidos, que consistem no fornecimento e montagem de um determinado número de instalações fotovoltaicas: No âmbito do projeto, estão igualmente previstos 71 conju...

22 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 16:4016:40, 2 March 2023DG Regio talk contribs 50,803 bytes −266 Changed label, description and/or aliases in it, da, lv, bg, sk, pt, ro, et, hr, cs, hu, lt, es, sv, nl, ga, el, sl, mt, fi, and other parts

25 October 2022

22 October 2022

27 July 2022

  • curprev 15:5915:59, 27 July 2022DG Regio talk contribs 49,406 bytes +29,243 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 07:5707:57, 2 December 2021DG Regio talk contribs 13,896 bytes +1,458 Created claim: summary (P836): Portée du projet mis en œuvre dans la formule: la conception et la construction comprennent: 1. Préparation de la documentation prject nécessaire: pour l’installation de 71 ensembles d’installations photovoltaïques produisant de l’électricité; 2. Réalisation des travaux de construction et d’installation selon des projets développés consistant en la fourniture et l’assemblage d’un certain nombre d’installations photovoltaïques: Dans le cadre du p...
  • curprev 07:5707:57, 2 December 2021DG Regio talk contribs 12,438 bytes +203 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 07:2307:23, 21 October 2020DG Regio talk contribs 12,674 bytes +192 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 07:2307:23, 21 October 2020DG Regio talk contribs 12,482 bytes −175 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 07:2307:23, 21 October 2020DG Regio talk contribs 12,657 bytes +1,364 Created claim: summary (P836): Scope of the project implemented in the formula: design and build includes: 1. Preparation of the necessary draft documentation: for the installation of 71 kpl. photovoltaic installations generating electricity; 2. Execution of construction and installation works according to developed projects, consisting of supply and assembly of a certain number of photovoltaic installations: As part of the project, 71 sets are also planned to provide investo...
  • curprev 07:2307:23, 21 October 2020DG Regio talk contribs 11,293 bytes −852 Removed claim: summary (P836): Scope of the project being implemented in the form of: design and build: 1. Preparation of the necessary prjector documentation: for the installation of 71 electricity supply chains; 2. Execution of construction works — installation of projects, consisting of the supply and installation of a certain number of photovoltaic installations: 71 complete. the project also plans to ensure investor supervision of building works — installation as well...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

10 March 2020

  • curprev 10:0210:02, 10 March 2020DG Regio talk contribs 10,423 bytes +852 Created claim: summary (P836): Scope of the project being implemented in the form of: design and build: 1. Preparation of the necessary prjector documentation: for the installation of 71 electricity supply chains; 2. Execution of construction works — installation of projects, consisting of the supply and installation of a certain number of photovoltaic installations: 71 complete. the project also plans to ensure investor supervision of building works — installation as well as...

25 February 2020

18 February 2020

31 January 2020

14 January 2020