Revision history of "Supply and installation of heat pumps together with adaptation of existing installations in sports facilities MOSiR Knurów at ul. Mining 2 and St. Hospital 23 in Knurov" (Q123721)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

13 December 2023

6 July 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:0320:03, 2 March 2023DG Regio talk contribs 49,821 bytes −31 Changed label, description and/or aliases in da, it, sk, lv, ga, ro, et, sl, sv, fi, cs, mt, de, hr, lt, bg, el, es, hu, pt, fr, nl, and other parts

25 October 2022

22 October 2022

27 July 2022

  • curprev 15:5815:58, 27 July 2022DG Regio talk contribs 48,188 bytes +28,332 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 07:5107:51, 2 December 2021DG Regio talk contribs 13,724 bytes +1,373 Created claim: summary (P836): Le champ d’application matériel du projet comprend la fourniture et l’installation de pompes à chaleur ainsi que l’adaptation de l’installation existante dans les installations sportives du MOSiR à Knurów: — piscine intérieure à ul. Hôpital 23, — salle de sport intérieure et piscine à ul. Exploitation minière 2. La tâche sera mise en œuvre dans la conception et la construction de la formule. Le PFU couvre le champ d’application de deux phases, l...
  • curprev 07:5007:50, 2 December 2021DG Regio talk contribs 12,351 bytes +265 Changed label, description and/or aliases in fr: translated_label

26 November 2020

29 October 2020

21 October 2020

  • curprev 10:3810:38, 21 October 2020DG Regio talk contribs 12,525 bytes +229 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:3810:38, 21 October 2020DG Regio talk contribs 12,296 bytes −233 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:3810:38, 21 October 2020DG Regio talk contribs 12,529 bytes +1,271 Created claim: summary (P836): The material scope of the project includes the supply and assembly of heat pumps together with the adaptation of the existing installation in the sports facilities of MOSiR in Knurów: — indoor swimming pool at ul. Hospital 23, – sports hall and indoor swimming pool at ul. It’s a mining 2. The task will be carried out in the formula design and build. The PFU covers the scope of two stages, and this proposal covers only the scope of Stage I., tran...
  • curprev 10:3810:38, 21 October 2020DG Regio talk contribs 11,258 bytes −792 Removed claim: summary (P836): The project’s material scope covers the delivery and installation of heat pumps with the fitting of an existing installation in the sports facilities of the MOSiR in Knurów: A swimming pool at ul. Hospital 23, — sports hall and swimming pool at ul. Mining 2. The task will be carried out in the design and structure of the project. PFU covers the scope of two steps, this proposal only covers the scope of Phase I., remove_old_english_translation

17 July 2020

10 June 2020

6 June 2020

26 March 2020

10 March 2020

  • curprev 10:0210:02, 10 March 2020DG Regio talk contribs 10,324 bytes +792 Created claim: summary (P836): The project’s material scope covers the delivery and installation of heat pumps with the fitting of an existing installation in the sports facilities of the MOSiR in Knurów: A swimming pool at ul. Hospital 23, — sports hall and swimming pool at ul. Mining 2. The task will be carried out in the design and structure of the project. PFU covers the scope of two steps, this proposal only covers the scope of Phase I., Adding English summary

25 February 2020

18 February 2020

31 January 2020

14 January 2020