Revision history of "Construction of renewable energy lighting in the municipality of Suszec" (Q123695)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 05:2605:26, 10 October 2024DG Regio talk contribs 47,641 bytes −1 Changed label, description and/or aliases in pt
  • curprev 05:2605:26, 10 October 2024DG Regio talk contribs 47,642 bytes −9 Set a claim value: summary (P836): O objeto do projeto é a construção de iluminação pública híbrida até 40 kW no município de Suszec, no montante de 101 unidades. Cada lâmpada será alimentada pelo módulo fotovoltaico e pela turbina eólica. As lâmpadas serão instaladas em postes de aço com uma altura de 9,5 m, colocados em uma liga de fundação pré-fabricada.

20 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3819:38, 2 March 2023DG Regio talk contribs 44,116 bytes +453 Changed label, description and/or aliases in da, sk, fi, cs, lv, de, ga, el, sv, bg, pt, ro, et, sl, hu, nl, fr, lt, hr, es, mt, and other parts

25 October 2022

22 October 2022

2 July 2022

  • curprev 19:5419:54, 2 July 2022DG Regio talk contribs 41,998 bytes +23,707 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 07:5107:51, 2 December 2021DG Regio talk contribs 13,029 bytes +1,193 Created claim: summary (P836): L’objet du projet est la construction d’un éclairage routier hybride jusqu’à 40 kW dans la zone de la commune de Suszec pour un montant de 101 pièces. Chaque lampe sera alimentée par un module photovoltaïque et une éolienne. Des lampes seront installées sur des poteaux en acier d’une hauteur de 9,5 mb, plantées sur un alliage de fondation préfabriqué., translated_summary
  • curprev 07:5107:51, 2 December 2021DG Regio talk contribs 11,836 bytes +158 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 10:3710:37, 21 October 2020DG Regio talk contribs 12,117 bytes +130 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:3710:37, 21 October 2020DG Regio talk contribs 11,987 bytes −141 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:3710:37, 21 October 2020DG Regio talk contribs 12,128 bytes +1,141 Created claim: summary (P836): The subject of the project is the construction of hybrid street lighting up to 40 kW in the municipality of Suszec in the amount of 101 units. Each lamp will be powered by photovoltaic module and wind turbine. The lamps will be installed on steel poles with a height of 9.5 m, placed on a prefabricated foundation alloy., translated_summary
  • curprev 10:3710:37, 21 October 2020DG Regio talk contribs 10,987 bytes −694 Removed claim: summary (P836): The object of the project is the construction of a 40 kW hybrid street lighting in the municipality of Suzac in a quantity of 101. Each lamp will be powered by a photovoltaic module and a wind turbine. The lamps will be installed on the steel poles with a height of 9,5 mb, on the basis of a prefabricated headline rate., remove_old_english_translation

17 July 2020

10 June 2020

6 June 2020

26 March 2020

10 March 2020

  • curprev 10:0110:01, 10 March 2020DG Regio talk contribs 9,955 bytes +694 Created claim: summary (P836): The object of the project is the construction of a 40 kW hybrid street lighting in the municipality of Suzac in a quantity of 101. Each lamp will be powered by a photovoltaic module and a wind turbine. The lamps will be installed on the steel poles with a height of 9,5 mb, on the basis of a prefabricated headline rate., Adding English summary

25 February 2020

18 February 2020

31 January 2020

14 January 2020