Revision history of "Installation of renewable sources from solar energy in public utility facilities in Ruda Śląska" (Q123688)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 16:3416:34, 2 March 2023DG Regio talk contribs 60,633 bytes −727 Changed label, description and/or aliases in lv, da, fr, ro, it, sk, bg, hr, et, sl, de, lt, ga, fi, nl, sv, el, es, hu, mt, pt, cs, and other parts

22 October 2022

27 July 2022

  • curprev 15:5715:57, 27 July 2022DG Regio talk contribs 60,542 bytes +37,233 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 07:5107:51, 2 December 2021DG Regio talk contribs 15,179 bytes +1,922 Created claim: summary (P836): L’objet du projet est la construction d’installations photovoltaïques dans 3 bâtiments de l’hôtel de ville Ruda Śl. Le projet utilisera des modules photovoltaïques d’une puissance de 40kWp à pl. Jean-Paul II 6; 3,6 kWp à ul. Niedurny 46 et 11,2 kWp à ul. Général Hallera 61. En outre, l’éclairage sera remplacé par LED — économie d’énergie (coût non quantifiable). Des systèmes photovoltaïques seront utilisés pour produire de l’électricité utilisée...
  • curprev 07:5107:51, 2 December 2021DG Regio talk contribs 13,257 bytes +177 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 10:3710:37, 21 October 2020DG Regio talk contribs 13,519 bytes +156 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:3710:37, 21 October 2020DG Regio talk contribs 13,363 bytes −169 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:3710:37, 21 October 2020DG Regio talk contribs 13,532 bytes +1,786 Created claim: summary (P836): The subject of the project is the construction of photovoltaic installations in 3 buildings of the City Hall of Ruda Śl. The project will use photovoltaic modules with a power of 40kWp at pl. John Paul II 6; 3.6 kWp at ul. Negligent 46 and 11.2 kWp at ul. It’s a gene. It’s Hallera 61. In addition, lighting will be replaced with LEDs – energy-efficient (ineligible cost). Photovoltaic systems will be used to produce electricity used in the current...
  • curprev 10:3710:37, 21 October 2020DG Regio talk contribs 11,746 bytes −1,306 Removed claim: summary (P836): The project consists of the construction of a photovoltaic installation in the 3 premises of the Municipal Office of Ruda Sl. A 40kWp photovoltaic module will be used in the project. John Paul II 6; 3,6 kWp at ul. Involuntary 46 and 11,2 kWp at ul. Gen. Hallera 61. In addition, lighting on leva — energy efficient (non-eligible cost) will be exchanged. Photovoltaic systems will be used to produce the electricity used in the current operation of...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

10 March 2020

  • curprev 10:0110:01, 10 March 2020DG Regio talk contribs 11,328 bytes +1,306 Created claim: summary (P836): The project consists of the construction of a photovoltaic installation in the 3 premises of the Municipal Office of Ruda Sl. A 40kWp photovoltaic module will be used in the project. John Paul II 6; 3,6 kWp at ul. Involuntary 46 and 11,2 kWp at ul. Gen. Hallera 61. In addition, lighting on leva — energy efficient (non-eligible cost) will be exchanged. Photovoltaic systems will be used to produce the electricity used in the current operation of t...

25 February 2020

18 February 2020

31 January 2020

14 January 2020