Revision history of "Low-energy cities – Czeladź" (Q123675)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:2318:23, 9 October 2024DG Regio talk contribs 65,573 bytes +12 Changed label, description and/or aliases in pt
  • curprev 18:2318:23, 9 October 2024DG Regio talk contribs 65,561 bytes −204 Set a claim value: summary (P836): O projeto está localizado na rua Czeladzi. Katowice 45 e inclui a instalação de células fotovoltaicas nas instalações da Câmara Municipal. Em conjunto, o projeto incluirá: — installation of photovoltaic panels in silicon technology on the roof of the building (154 pieces), – installation of photovoltaic panels in thin-layer technology on the elevations of the southern building (168 pcs), – power supply and lightning installation – high-level drainag...

22 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:1119:11, 2 March 2023DG Regio talk contribs 62,230 bytes +2,094 Changed label, description and/or aliases in lv, da, sk, ro, cs, de, sv, pt, lt, ga, bg, hu, fr, es, fi, el, et, hr, sl, mt, and other parts

25 October 2022

22 October 2022

2 July 2022

  • curprev 19:5419:54, 2 July 2022DG Regio talk contribs 58,464 bytes +35,539 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 07:5007:50, 2 December 2021DG Regio talk contribs 14,954 bytes +1,940 Created claim: summary (P836): Le projet est situé à Czeladzi, ul. Katowicka 45 et comprend l’installation de cellules photovoltaïques dans les locaux de l’hôtel de ville. Au total, le projet comprendra: — installation de panneaux photovoltaïques en technologie de silicium sur le toit du bâtiment (154 unités), — installation de panneaux photovoltaïques en technologie de film mince sur les façades sud du bâtiment (168 pièces), — alimentation électrique et système de foudre — s...
  • curprev 07:5007:50, 2 December 2021DG Regio talk contribs 13,014 bytes +96 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 10:3610:36, 21 October 2020DG Regio talk contribs 13,357 bytes +89 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:3610:36, 21 October 2020DG Regio talk contribs 13,268 bytes −95 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:3610:36, 21 October 2020DG Regio talk contribs 13,363 bytes +1,742 Created claim: summary (P836): The project is located in Czeladzi street. Katowice 45 and includes the installation of photovoltaic cells on the premises of the City Hall. Together, the project will include: — installation of photovoltaic panels in silicon technology on the roof of the building (154 pieces), – installation of photovoltaic panels in thin-layer technology on the elevations of the southern building (168 pcs), – power supply and lightning installation – high-leve...
  • curprev 10:3610:36, 21 October 2020DG Regio talk contribs 11,621 bytes −1,375 Removed claim: summary (P836): The project is located at ul. Katowicka 45 and includes the installation of photovoltaic cells at the premises of the Town Hall. The project will include: — installation of photovoltaic panels in silicon technology on the roof of the building (154 units), — installation of photovoltaic panels for thin-layer technology on the façade of the southern building (168 units), — Power supply installations and a lightning system — a system of high hori...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

10 March 2020

  • curprev 10:0110:01, 10 March 2020DG Regio talk contribs 11,272 bytes +1,375 Created claim: summary (P836): The project is located at ul. Katowicka 45 and includes the installation of photovoltaic cells at the premises of the Town Hall. The project will include: — installation of photovoltaic panels in silicon technology on the roof of the building (154 units), — installation of photovoltaic panels for thin-layer technology on the façade of the southern building (168 units), — Power supply installations and a lightning system — a system of high horizo...

25 February 2020

18 February 2020

31 January 2020

14 January 2020