Revision history of "Purchase and assembly of photovoltaic panels with a capacity of 25.5 kW by Worker Cooperative Housing Unity in Siemianowice Ślaskie." (Q123674)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 04:0604:06, 11 October 2024DG Regio talk contribs 66,349 bytes −5 Changed label, description and/or aliases in pt
  • curprev 04:0604:06, 11 October 2024DG Regio talk contribs 66,354 bytes −50 Set a claim value: summary (P836): No âmbito do projeto, está prevista a instalação de uma microinstalação de uma central fotovoltaica no telhado de um complexo de edifícios multifamiliares pertencentes à Unidade Cooperativa de Habitação dos Trabalhadores. O investimento previsto pelo requerente reduzirá a poluição atmosférica na região, as baixas emissões e as faturas de energia. A potência-alvo da instalação é de 25,5 kWp, que será gerada por módulos fotovoltaicos com uma potência...

7 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:0320:03, 2 March 2023DG Regio talk contribs 62,869 bytes +1,069 Changed label, description and/or aliases in da, it, sk, el, sv, bg, hu, de, fr, fi, ro, lv, ga, et, cs, pt, nl, lt, sl, es, mt, hr, and other parts

22 October 2022

27 July 2022

  • curprev 15:5715:57, 27 July 2022DG Regio talk contribs 60,975 bytes +37,079 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 07:5007:50, 2 December 2021DG Regio talk contribs 15,394 bytes +1,993 Created claim: summary (P836): Dans le cadre du projet, il est prévu d’installer une micro-installation d’une centrale photovoltaïque sur le toit d’un complexe de bâtiments multifamiliaux appartenant à la coopérative de logement des travailleurs Jedność. L’investissement proposé par le demandeur permettra de réduire la pollution atmosphérique dans la région, de réduire les faibles émissions ainsi que les factures d’énergie. La puissance cible de l’installation est de 25,5 kWp...
  • curprev 07:5007:50, 2 December 2021DG Regio talk contribs 13,401 bytes +215 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 10:3610:36, 21 October 2020DG Regio talk contribs 13,625 bytes +193 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:3610:36, 21 October 2020DG Regio talk contribs 13,432 bytes −223 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:3610:36, 21 October 2020DG Regio talk contribs 13,655 bytes +1,779 Created claim: summary (P836): As part of the project, it is planned to install a micro-installation of photovoltaic power plant on the roof of a complex of multi-family buildings belonging to the Workers’ Cooperative Housing Unity. The investment planned by the applicant will reduce air pollution in the region, reduce low emissions and energy bills. The target power of the installation is 25.5 kWp, which will be generated by photovoltaic modules with a power of 255 Wp each....
  • curprev 10:3610:36, 21 October 2020DG Regio talk contribs 11,876 bytes −1,319 Removed claim: summary (P836): The project intends to install a micro-installation of a photovoltaic power plant on the roof of a team of multi-family buildings belonging to the Workers’ Housing Cooperative. The investment planned by the Applicant will contribute to reducing air pollution in the region, reducing emissions and energy bills. The target capacity of the installation is 25,5 kWp, which will be generated using the PV modules of 255 Wp each. According to provision...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

10 March 2020

  • curprev 10:0110:01, 10 March 2020DG Regio talk contribs 11,491 bytes +1,319 Created claim: summary (P836): The project intends to install a micro-installation of a photovoltaic power plant on the roof of a team of multi-family buildings belonging to the Workers’ Housing Cooperative. The investment planned by the Applicant will contribute to reducing air pollution in the region, reducing emissions and energy bills. The target capacity of the installation is 25,5 kWp, which will be generated using the PV modules of 255 Wp each. According to provisional...

25 February 2020

18 February 2020

31 January 2020

14 January 2020